Warren County · Allamuchy Township · #26-007-SP
KAD Mall Properties site plan, Route 517
Route 517, Allamuchy Township, NJ · 13 homes, mixed use
About this project
Site plan on Route 517 in Allamuchy Township for a 13-unit mixed-use project, paired with a zoning change from CM to MX.
Official description: CM → MX
- Applicant
- KAD Mall Properties LLC
- Plan type
- SitePlan PF
- Land use
- Mixed_Use
- Water
- OffSite
- Sewer
- OffSite
- Status
- Approval
The full picture AI research · Nov 1, 2026
County records show a site plan on Route 517 in Allamuchy Township, Warren County, for a mixed-use project with 13 new homes. A mixed-use project combines housing with other uses, usually shops or offices, on the same property. The applicant is KAD Mall Properties LLC.
The filing is paired with a request to change the zoning of the land from CM to MX. The records do not say what CM and MX stand for in this township. The change presumably would allow a wider mix of uses than the current zoning permits.
No news coverage, township agendas or minutes, developer web page or state permit records specific to this project were found. The details above come from the county record alone. The site's current use, the size of any commercial space and any future occupants are not known.
What it could mean nearby
- 13 new homes would add some households to the Route 517 corridor.
- Route 517 access and traffic effects are not documented. Traffic would normally be reviewed as part of the site plan.
- The zoning change could affect what else may be built on the site later.
Where it stands
A site plan was filed with the county on 2026-05-19, together with a zoning change request. Typically the township reviews the application for completeness, holds a public hearing, and then votes to approve, approve with conditions or deny. Any rezoning would also need approval by the township's governing body.
- May 19, 2026 Latest county filing for the site plan and CM-to-MX zoning change
Want to weigh in? The Allamuchy Township planning board normally hears site plans, and the township committee normally decides zoning changes. Residents can usually comment at their public hearings, which are announced on the township website.
Who's behind it
KAD Mall Properties LLC
Planning terms explained
- Site plan
- A detailed layout showing buildings, parking, driveways, drainage and landscaping that the township reviews before construction.
- Mixed use
- A development that combines different uses, such as homes and businesses, on one site.
- Zoning change (rezoning)
- An official change to the rules that control what can be built on a piece of land.
- CM and MX zones
- Zoning district labels. CM is the current district and MX is the proposed one. Their exact meanings are set by the township's code.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $7.3M
- ~416 roofing squares
- ~13 HVAC systems
- ~13 kitchens / 26+ bathrooms
- ~36,400 sq ft of finished living space