PlannedNearby

Warren County · Farmington · #WN-001-567300

Fairbanks Run Substation, Farmington (Map Pg 2)

Fairbanks Run, Farmington, PA · agricultural

In short: Fairbanks Run Substation, Farmington (Map Pg 2) is an agricultural project in Farmington, Warren County, PA. As of November 24, 2026, it is approved. Latest record: Subdivision (approved), map page 2 approved (November 3, 2026). What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved Subdivision (approved), map page 2 approved · Nov 3, 2026 · source
  1. Proposed
  2. In review
  3. ApprovedNov 2026
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

Lindell Resources LLC's Fairbanks Run Substation plan in Farmington was approved on 9/15/2026; this entry is page 2 of the map set. The agenda gives no site size or other details.

Applicant
Lindell Resources LLC
Plan type
Subdivision (approved), map page 2
Land use
other

Project history

  • 2026-11-03 · #WN-001-567300 · Subdivision (approved), map page 2

County plan review office →

The full picture AI research · Nov 5, 2026

Lindell Resources LLC's "Fairbanks Run Substation" plan in Farmington Township, Warren County, was approved as a subdivision on 9/15/2026. The county's record for page 2 of the map set was approved on 2026-11-03. A subdivision approval means the county accepted a plan to divide or re-draw land boundaries. The county labels the plan agricultural.

The county agenda gives no site size, no building plans and no number of lots. The word "Substation" in the name could mean a utility electrical facility, but the records do not say. Nothing found online confirms what will be built.

No developer website, news coverage, meeting minutes, listings, permits or signs of construction were found for this site. What is on the ground today is unknown. Searches turned up only unrelated records, such as a separate electric-grid queue entry with a similar name, which could not be tied to this plan.

What it could mean nearby

Where it stands

The subdivision was approved on 9/15/2026, and the final map page was recorded as approved on 2026-11-03. Next steps usually include any municipal or state permits needed before work starts. The records do not say which permits apply.

Who's behind it

Lindell Resources LLC

Planning terms explained
Subdivision
The division of a piece of land into separate parcels or lots, or the re-drawing of its boundaries.
Map set
The group of plan pages that together show a project, each page recorded separately.
Substation
A utility facility that adjusts electrical voltage before power moves along the grid.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 5, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The subdivision is already approved. Residents can ask the Farmington Township office or the Warren County planning office about later permits or meetings.

In Pennsylvania, Farmington decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Farmington's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →