[Warren County](https://plannednearby.com/c/warren-pa/) · [Farmington](https://plannednearby.com/c/warren-pa/farmington) · #WN-001-567300

# Fairbanks Run Substation, Farmington (Map Pg 2)

Fairbanks Run, Farmington, PA · agricultural

In short: **Fairbanks Run Substation, Farmington (Map Pg 2)** is an agricultural project in Farmington, Warren County, PA. As of November 24, 2026, it is approved. Latest record: Subdivision (approved), map page 2 approved (November 3, 2026). What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Stage: Approved · Subdivision (approved), map page 2 approved · Nov 3, 2026 · [source](https://www.warrencountypa.gov/AgendaCenter/ViewFile/Agenda/_11032026-762)

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

## About this project

Lindell Resources LLC's Fairbanks Run Substation plan in Farmington was approved on 9/15/2026; this entry is page 2 of the map set. The agenda gives no site size or other details.

- **Applicant:** [Lindell Resources LLC](https://plannednearby.com/f/lindell-resources-llc)
- **Plan type:** Subdivision (approved), map page 2
- **Land use:** other

## Project history

- **2026-11-03** · #WN-001-567300 · Subdivision (approved), map page 2

[County plan review office →](https://www.warrencountypa.gov/AgendaCenter/ViewFile/Agenda/_11032026-762)

## The full picture AI research · Nov 5, 2026

Lindell Resources LLC's "Fairbanks Run Substation" plan in Farmington Township, Warren County, was approved as a subdivision on 9/15/2026. The county's record for page 2 of the map set was approved on 2026-11-03. A subdivision approval means the county accepted a plan to divide or re-draw land boundaries. The county labels the plan agricultural.

The county agenda gives no site size, no building plans and no number of lots. The word "Substation" in the name could mean a utility electrical facility, but the records do not say. Nothing found online confirms what will be built.

No developer website, news coverage, meeting minutes, listings, permits or signs of construction were found for this site. What is on the ground today is unknown. Searches turned up only unrelated records, such as a separate electric-grid queue entry with a similar name, which could not be tied to this plan.

### What it could mean nearby

- The records give no size, use or traffic details, so effects on the neighborhood cannot be judged yet.
- If a utility facility is built, any effects would depend on plans not yet public.

### Where it stands

The subdivision was approved on 9/15/2026, and the final map page was recorded as approved on 2026-11-03. Next steps usually include any municipal or state permits needed before work starts. The records do not say which permits apply.

- **Nov 3, 2026** County records show map page 2 approved
- **Sep 15, 2026** Subdivision plan approved

### Who's behind it

Lindell Resources LLC

Planning terms explained

- **Subdivision:** The division of a piece of land into separate parcels or lots, or the re-drawing of its boundaries.
- **Map set:** The group of plan pages that together show a project, each page recorded separately.
- **Substation:** A utility facility that adjusts electrical voltage before power moves along the grid.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 5, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The subdivision is already approved. Residents can ask the Farmington Township office or the Warren County planning office about later permits or meetings.

In Pennsylvania, Farmington decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Farmington planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Farmington manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Farmington's meeting agendas →](https://www.google.com/search?q=Farmington+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Approved subdivision in Farmington Township](https://plannednearby.com/x/warren-yv-003-56300562500) — 0.4 mi · agricultural · Farmington Township · filed 2026-09-01
- [Approved subdivision, Farmington (individual applicant)](https://plannednearby.com/x/warren-wn-001-463246253) — 0.8 mi · subdivision (use not stated) · Farmington · filed 2026-01-06
- [Approved subdivision in Pine Grove](https://plannednearby.com/x/warren-wn-002-1530) — 4.2 mi · subdivision (use not stated) · Pine Grove · filed 2026-09-01
- [Subdivision in Pine Grove (approved 10/2/2026)](https://plannednearby.com/x/warren-wn-002-2799) — 4.4 mi · subdivision (use not stated) · Pine Grove · filed 2026-11-03
- [Subdivision approved in Pine Grove](https://plannednearby.com/x/warren-wn-257-8360) — 4.5 mi · subdivision (use not stated) · Pine Grove · filed 2026-06-02
- [Setback waiver for proposed subdivision](https://plannednearby.com/x/warren-2026-04-setback-waiver-for-proposed-subdivision) — 4.9 mi · subdivision (use not stated) · Pine Grove Township · filed 2026-04-07

[See everything nearby on a map →](https://plannednearby.com/near#41.95744,-79.22364,Farmington)

---

Source page: https://plannednearby.com/x/warren-wn-001-567300

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
