York County · Fairview Township · #24-0005
Office building on 8.5 acres in Fairview Township
Fairview Township, PA · 9,000 sq ft non-residential, office · 8.5 acres
About this project
Preliminary-final land development for a 9,000 sq. ft. office building on an 8.5-acre site in Fairview Township.
County recommendation: Consistent with county plan
- Engineer / designer
- Integrated Consulting
- Plan type
- Preliminary Final Land development
- Land use
- Commercial
- Water
- Public water
- Sewer
- Public sewer
Filing history
- 2024-01-08 · #24-0005 · Preliminary Final Land development · 9,000 sq ft
The full picture AI research · Nov 1, 2026
A land development plan was filed with York County for a single office building of about 9,000 square feet on an 8.5-acre site in Fairview Township. The building would take up a small part of the land. The rest would probably be parking, driveways, stormwater features and open or landscaped ground.
The county record doesn't say what is on the site now, who would occupy the building, or whether anyone opposes it. The filing is described as "preliminary-final." That means the developer asked the township to review the preliminary and final plans in a single step.
No news coverage, meeting agendas, minutes or developer project page could be matched to this project. The only firm named in the county record is Integrated Consulting.
What it could mean nearby
- An office building of this size would likely add some daily car trips for employees and visitors. The records give no traffic study or access details.
- The records don't say how many jobs the building would hold or whether homes are planned.
- Because only about 9,000 sq ft is planned on 8.5 acres, much of the site could stay undeveloped, but the records don't give a site layout.
Where it stands
The most recent county filing is dated January 2024. The records don't show whether the township has approved the plan. A plan like this usually goes to the township planning commission, and then to the elected supervisors for a vote. After approval, the developer must meet any conditions and get building and stormwater permits before construction.
- Jan 8, 2024 Latest filing for the preliminary-final land development plan in county records
Want to weigh in? Fairview Township's planning commission and board of supervisors normally review land development plans at public meetings. Residents can usually comment there, and the township office can confirm meeting dates.
Planning terms explained
- Land development
- A formal township review of plans to build on a site, covering buildings, parking, drainage and access.
- Preliminary-final plan
- A combined submission that lets the township review the preliminary and final plans together instead of in two rounds.
- Non-residential square footage
- The floor area of buildings that are not homes, such as offices or shops.
- Stormwater management
- The drainage features, such as basins, that control rainwater runoff from roofs and pavement.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.7M
- ~30 roofing squares (assumes 3 stories)
- ~22 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →