A preliminary final subdivision of a 5.9-acre site in Lower Windsor Township would create four single-family units, with part of the site in the Kreutz Creek Watershed.
Official description: Portion of the site is within the Kreutz Creek Watershed.
County recommendation: Consistent with county plan
- Engineer / designer
- Site Design Concepts, Inc.
- Plan type
- Preliminary Final Subdivision
- Land use
- Single-family
- Water
- On-lot well
- Sewer
- On-lot septic
Filing history
- 2024-02-01 · #24-0018 · Preliminary Final Subdivision · 4 lots/units
The full picture AI research · Nov 1, 2026
A preliminary/final subdivision plan has been filed for a 5.9-acre site in Lower Windsor Township, York County. It would create four single-family home lots. Part of the site lies in the Kreutz Creek Watershed, the stream drainage area where stormwater and erosion controls matter.
A "preliminary/final" plan combines two review steps into one. That usually means the layout is simple enough that the township does not need a separate preliminary stage. The land now appears to be undeveloped or lightly used. The county record does not say what is on it today.
Site Design Concepts, Inc. is the firm named on the filing. It is usually a site-design or engineering firm, not the builder. No developer website, news coverage, hearing notice or approval decision could be confirmed as clearly about this exact project.
What it could mean nearby
- Four new homes would add a small number of households, so traffic and school effects should be modest.
- Part of the site is in the Kreutz Creek Watershed, so stormwater and erosion controls are likely to be reviewed.
- Whether the homes would use public water and sewer or on-site wells and septic systems is not stated in the county records.
Where it stands
The county's latest filing is dated 2024-02-01, and the plan was in review at that point. Typically the township planning commission reviews the plan and advises, then the township supervisors vote to approve or deny. Approved plans are then recorded and the lots can be built on once permits are issued. The current status could not be confirmed from the sources found.
- Feb 1, 2024 Latest subdivision filing recorded by York County planning
Want to weigh in? The Lower Windsor Township planning commission and board of supervisors decide this. Residents can usually comment at their public meetings, and the township office can provide agendas and schedules.
Who's behind it
Site Design Concepts, Inc. · The firm is named on the county filing and appears to be a site-design or engineering consultant. Its other work was not confirmed.
Planning terms explained
- Preliminary/final subdivision
- A plan that combines the two usual review steps for dividing land into lots, so it is reviewed once instead of twice.
- Watershed
- The land area that drains rain and runoff into a particular stream, here Kreutz Creek.
- Stormwater management
- Design features that control rain runoff so it does not cause flooding or pollute nearby streams.
- Planning commission
- A local volunteer board that reviews development plans and advises the elected supervisors.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.2M
- ~128 roofing squares
- ~4 HVAC systems
- ~4 kitchens / 8+ bathrooms
- ~11,200 sq ft of finished living space