York County · West Manchester Township · #24-0076
Wldon Drive LLC
West Manchester Township, PA · 24 homes, apartments · 2.9 acres
About this project
Final land development for 24 multi-family homes on about 2.9 acres in West Manchester Township.
County recommendation: Consistent with county plan
- Engineer / designer
- site design concepts
- Plan type
- Final Land development
- Land use
- Multi-family
- Water
- Public water
- Sewer
- Public sewer
Filing history
- 2024-04-23 · #24-0076 · Final Land development · 24 lots/units
The full picture AI research · Nov 1, 2026
A company called Weldon Drive LLC (spelled "Wldon" in the county record) has proposed one multifamily building with 24 apartments. The site is about 2.9 acres on Weldon Drive in West Manchester Township, York County, in an area zoned R-4 Residential.
The county record calls the plan a final land development. The township's June 2024 notice calls it a combined preliminary/final plan. That means the developer asked for both review stages at once. The plan also includes parking and other site improvements. A site design firm prepared it.
The township's records don't say what is on the site now or who will live there. The developer asked to delay the item at the May 2024 planning commission meeting. It was then put on the June 11, 2024 agenda. No news coverage, opposition or approval outcome was found.
What it could mean nearby
- The plan adds 24 apartments to a residential zone, which would add some housing choices nearby.
- More households would likely mean more vehicle trips on Weldon Drive and nearby roads. No traffic study was found online.
- The building would need connections to public utilities and stormwater controls. Those are normally reviewed during land development.
Where it stands
The township planning commission was scheduled to review the plan on June 11, 2024. The latest county filing is dated April 23, 2024. The final outcome was not found online. Next steps usually are a recommendation to the supervisors, a vote on the plan, and then recording of the approved plan before construction permits.
- Jun 11, 2024 Planning commission scheduled to review and act on the 24-unit plan
- May 14, 2024 Developer asked for the plan to be tabled at the planning commission meeting
- Apr 23, 2024 Latest filing in the county planning records
Want to weigh in? The West Manchester Township Planning Commission reviews the plan first, and the township supervisors normally decide it. Residents can comment at public meetings held at the township municipal building or on Zoom, and agendas are posted on the township website.
Who's behind it
Weldon Drive, LLC
Around the web
- PUBLIC NOTICE – PLANNING COMMISSION MEETING – JUNE 11, 2024West Manchester Township · Jun 4, 2024Confirms a 2.93-acre R-4 site on Weldon Drive and a 24-unit multifamily preliminary/final plan on the June 11, 2024 agenda, after the May 14 tabling.
- 6 11 2024 PC AgendaWest Manchester Township · Jun 4, 2024The official planning commission agenda for the June 11, 2024 meeting.
Planning terms explained
- Land development plan
- A detailed site plan showing buildings, parking, roads, utilities and drainage, which the township reviews before construction.
- Preliminary/final plan
- A request to combine the two usual review stages into one approval.
- R-4 Residential Zone
- A zoning district set aside mainly for housing.
- Tabled
- Postponed to a later meeting without a decision.
- Multifamily
- A building with several separate homes, such as apartments.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $5.8M
- ~144 roofing squares
- ~24 HVAC systems
- ~24 kitchens / 48+ bathrooms
- ~24,000 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →