York County · Manchester Township · #24-0080
Eagles View, Phase 5
Manchester Township, PA · 23 homes, single-family homes · 9.4 acres
About this project
Phase 5 of the Eagles View development proposes 23 single-family homes on about 9.4 acres in Manchester Township, York County.
County recommendation: Consistent with county plan
- Engineer / designer
- James R. Holley & Associates, Inc.
- Plan type
- Preliminary Final Subdivision
- Land use
- Single-family
- Water
- Public water
- Sewer
- Public sewer
Filing history
- 2024-05-02 · #24-0080 · Preliminary Final Subdivision · 23 lots/units
The full picture AI research · Nov 1, 2026
Phase 5 of the Eagles View neighborhood in Manchester Township, York County, proposes 23 single-family homes on about 9.4 acres. That works out to roughly one home for every 0.4 acre, or about 2.4 homes per acre.
The county filing doesn't say what is on the land now. Phase 5 is the fifth stage of an existing neighborhood, so the site is probably undeveloped land next to homes that are already built. That is an inference, not something the records state.
The search found no news coverage, township meeting agendas or minutes, hearing notices, developer project page or permits that clearly refer to Phase 5. Only general home-sale listings for Eagles View turned up. They are not specific enough to cite, so nothing is reported here about opposition, approvals or who will build the homes. The latest county filing is dated 2024-05-02.
What it could mean nearby
- The 23 new homes would add vehicle trips on the streets serving the existing Eagles View neighborhood. The records don't include a traffic study.
- The new households would add some students to the local school district and some demand on public water and sewer. The records give no figures.
- The county records don't say how much open space or how many jobs are involved.
Where it stands
The county's latest filing is dated 2024-05-02, and no later approval or construction information was found. Projects like this usually move through township planning review and approval of the subdivision plan. After approval come engineering and permit steps, and then construction.
- May 2024 Latest county planning filing for Eagles View, Phase 5 (filed 2024-05-02)
Want to weigh in? Residents can usually comment at Manchester Township planning commission and board of supervisors meetings, which are public. Contact the township office for current agendas.
Planning terms explained
- Phase
- One stage of a larger development that is planned and built in sections over time.
- Subdivision plan
- A map showing how a larger piece of land will be divided into individual building lots and streets.
- Single-family home
- A freestanding house designed for one household.
- Planning commission
- A local advisory board that reviews development plans and recommends action to elected officials.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $12.9M
- ~736 roofing squares
- ~23 HVAC systems
- ~23 kitchens / 46+ bathrooms
- ~64,400 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →