York County · Newberry Township · #24-0230
Monarch Office Expansion
Newberry Township, PA · 10,800 sq ft non-residential, office · 17.6 acres
About this project
A preliminary final land development adding a 10,800 sq. ft. building to a 17.6-acre property in Newberry Township.
County recommendation: Consistent with county plan
- Engineer / designer
- Landworks Civil Design, LLC
- Plan type
- Preliminary Final Land development Building addition
- Land use
- Industrial
- Water
- Public water
- Sewer
- On-lot septic
Filing history
- 2024-12-13 · #24-0230 · Preliminary Final Land development Building addition · 10,800 sq ft
The full picture AI research · Nov 1, 2026
A 10,800-square-foot office building is proposed on a 17.6-acre property in Newberry Township, York County. The project is called Monarch Office Expansion. County records describe it as adding a new building to a property that already has development on it, and the name suggests it expands an existing office use.
The filing is a preliminary final land development plan. That is a detailed site plan the township reviews before it allows construction. The civil engineering firm Landworks Civil Design, LLC is listed on the filing.
No news coverage, meeting agendas, developer web pages or hearing notices were found for this project. Details such as the future occupant, any opposition, and approval votes are unknown.
What it could mean nearby
- The county records give no traffic, jobs, school or utility figures, so the effects on the neighborhood cannot be stated.
- A 10,800 sq. ft. building on 17.6 acres is small compared with the site, so much of the land would likely stay undeveloped. This is an inference from the size figures and has not been confirmed.
Where it stands
The latest county filing was on 2024-12-13, at the preliminary final land development stage. Typically the township planning commission and supervisors review and vote on the plan next. After approval, building and stormwater permits are issued before construction starts. No later action was found online.
- Dec 13, 2024 Latest county filing for the preliminary final land development plan
Want to weigh in? Newberry Township's planning commission and board of supervisors usually review land development plans at public meetings, and residents can comment there. Check the township's posted agendas for dates.
Planning terms explained
- Preliminary final land development plan
- A detailed site plan showing the building, parking, stormwater and utilities, submitted to the township for review and approval.
- Land development
- Construction of a new building or major site changes that need formal municipal review.
- Non-residential square footage
- Floor area used for offices or businesses, not homes.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $3.2M
- ~36 roofing squares (assumes 3 stories)
- ~27 tons of cooling (rule of thumb 400 sq ft/ton)