York County · Lower Chanceford Township · #25-0055
4-unit single-family subdivision in Lower Chanceford
Lower Chanceford Township, PA · 4 homes, single-family homes · 8.5 acres
About this project
Final subdivision plan for four single-family units on about 8.5 acres in Lower Chanceford Township.
County recommendation: Consistent with county plan
- Engineer / designer
- Clark P. Craumer, LLC
- Plan type
- Preliminary Final Subdivision
- Land use
- Single-family
- Water
- On-lot well
- Sewer
- On-lot septic
Filing history
- 2025-03-20 · #25-0055 · Preliminary Final Subdivision · 4 lots/units
The full picture AI research · Nov 1, 2026
County records show a final subdivision plan to divide about 8.5 acres in Lower Chanceford Township, York County, into four single-family home lots. The plan lists Clark P. Craumer, LLC on the filing. The county's latest filing is dated March 20, 2025.
A final subdivision plan is the last major drawing a township reviews before land can be legally split into separate lots. At roughly two acres per home, the lots would be fairly large and spread out. The records don't say what is on the land now, but a rural parcel of this size is often farmland, woods or a single existing home.
No news coverage, meeting minutes, hearing notices or developer web pages were found that clearly refer to this project. Nothing was found about opposition, approvals or who will live there.
What it could mean nearby
- Four new homes would add a small number of households, so any added traffic on nearby roads would likely be modest.
- Lots of about two acres each would probably use private wells and septic systems, but the records do not confirm this.
- Four homes would add few students, so the effect on schools is likely small.
Where it stands
The latest county filing was in March 2025, and no later approval or decision was found online. Usually the township planning commission and supervisors review a final plan and approve it, sometimes with conditions. After that the plan is recorded and the lots can be sold and built on.
- Mar 20, 2025 Latest county filing for the final subdivision plan
Want to weigh in? The Lower Chanceford Township Board of Supervisors normally decides on final subdivision plans after the planning commission reviews them, and residents can comment at their public meetings.
Who's behind it
Clark P. Craumer, LLC
Planning terms explained
- Final subdivision plan
- The last detailed drawing a township approves before a piece of land is legally divided into separate lots.
- Subdivision
- The division of one parcel of land into two or more lots for sale or development.
- Planning commission
- A local volunteer board that reviews development plans and advises the elected supervisors.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.2M
- ~128 roofing squares
- ~4 HVAC systems
- ~4 kitchens / 8+ bathrooms
- ~11,200 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →