The Conewago Township Sewer Authority plans an upgrade to its wastewater treatment facility in Conewago Township, involving about 6,603 sq ft.
Official description: Wastewater treatment facility upgrade
County recommendation: Consistent with county plan
- Engineer / designer
- Buchart Horn
- Plan type
- Preliminary Final Land development
- Land use
- Other
- Water
- On-lot well
- Sewer
- On-lot septic
Filing history
- 2025-09-17 · #25-0175 · Preliminary Final Land development · 6,603 sq ft
The full picture AI research · Nov 1, 2026
The Conewago Township Sewer Authority, which runs the wastewater treatment plant in Conewago Township, York County, has filed plans for an upgrade to that plant. The county record lists about 6,603 square feet of non-residential space. That is a small building or addition compared with the whole plant.
The plant already treats household and business sewage for the township. The county record doesn't say which equipment or buildings are changing. Upgrades like this usually replace or add treatment equipment, or add a building to house it. They usually don't add customers. An engineering firm, Buchart Horn, is listed on the filing.
No news coverage, meeting minutes or project page specific to this upgrade were found, so no opposition, approvals or schedule are known.
What it could mean nearby
- Construction would probably happen on the existing plant site, so traffic effects would likely be limited to occasional deliveries and workers.
- The records give no sign of new homes, jobs or changes to open space or schools.
- The upgrade is meant to keep sewer service dependable for current customers, but the records don't confirm what it will change.
Where it stands
The county's latest filing is dated 2025-09-17, which suggests plans are under local review. No approval or construction start was found online. Next steps usually include township review of the plans, state environmental permits for changes at a sewage plant, then bidding and construction.
- Sep 17, 2025 Latest filing for the project in county planning records
Want to weigh in? The sewer authority's board and the Conewago Township supervisors are the likely local bodies, and residents can usually comment at their public meetings. Confirm meeting dates with the township.
Who's behind it
Conewago Township Sewer Authority (engineer on filing: Buchart Horn) · The sewer authority is the public body that operates the township's wastewater system, and Buchart Horn is an engineering and design firm that works on public infrastructure.
Planning terms explained
- Sewer authority
- A public body set up by a municipality to own and run sewer pipes and treatment plants.
- Wastewater treatment plant
- A facility that cleans sewage and used water before it is released back to a stream.
- Non-residential square footage
- Floor area of buildings that are not homes, such as utility or commercial buildings.
- Land development plan
- A set of plans a municipality reviews before a site is built or expanded.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.3M
- ~33 roofing squares (assumes 2 stories)
- ~16 tons of cooling (rule of thumb 400 sq ft/ton)