York County · Manchester Township · #25-0194
Penn Avenue Residential
Manchester Township, PA · 83 homes, single-family homes · 52.7 acres
About this project
A preliminary final subdivision for 83 single-family homes on about 52.7 acres in Manchester Township, York County.
County recommendation: Consistent with county plan
- Engineer / designer
- Landworks Civil Design, LLC
- Plan type
- Preliminary Final Subdivision
- Land use
- Single-family
- Water
- Public water
- Sewer
- Public sewer
Filing history
- 2025-10-09 · #25-0194 · Preliminary Final Subdivision · 83 lots/units
The full picture AI research · Nov 1, 2026
Penn Avenue Residential is a plan to build 83 single-family homes on about 52.7 acres in Manchester Township, York County. County records describe it as a preliminary final subdivision. That means the land would be divided into individual house lots, with streets and shared areas laid out, in a single combined review step.
A December 2025 township planning commission agenda lists the plan as a final subdivision plan for 83 house lots plus two open space lots. The land is in the township's Residential Low zoning district. The agenda excerpt does not say whether the plan was approved. No news coverage, opposition, builder name or buyer information was found.
The county filing names Landworks Civil Design, LLC, which is a civil engineering and design firm. It is not named as the builder.
What it could mean nearby
- 83 new households would add traffic on Penn Avenue and nearby roads. The records found do not include a traffic study.
- Two open space lots are part of the plan, so some land is set aside as common open space.
- New homes would add to local housing supply and to school enrollment and utility demand. No figures were found.
Where it stands
The plan was on the township planning commission's agenda in December 2025, and the county's latest filing is dated 2025-10-09. Typically the planning commission and the York County planning agency review the plan and make recommendations. The township supervisors then vote on approval, often with conditions. After approval, the developer must still obtain construction and stormwater permits.
- Dec 17, 2025 Township planning commission agenda lists the Penn Avenue Residential final subdivision plan (83 lots plus 2 open space lots)
- Oct 9, 2025 Latest county planning filing for the project
Want to weigh in? The Manchester Township Planning Commission reviews the plan first, and the Board of Supervisors makes the final decision. Residents can comment at their public meetings, and agendas are posted on the township website.
Around the web
- Manchester Township Planning Commission agenda, December 2025Manchester Township · Dec 17, 2025Lists the Penn Avenue Residential final subdivision plan for 83 single-family lots and two open space lots in the Residential Low district.
Planning terms explained
- Preliminary final subdivision
- A single plan that combines the preliminary and final approval steps for dividing land into lots.
- Residential Low (RL) District
- A zoning category that allows low-density housing, mainly single-family homes.
- Open space lot
- A parcel set aside in the plan as common land that is not used for houses.
- Planning commission
- An appointed local board that reviews development plans and advises the elected supervisors.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $46.5M
- ~2,656 roofing squares
- ~83 HVAC systems
- ~83 kitchens / 166+ bathrooms
- ~232,400 sq ft of finished living space