York County · Fairview Township · #26-0070

Forge Haven Valley

Fairview Township, PA · 67 homes, single-family homes · 71.2 acres

About this project

Preliminary subdivision of a 71.2-acre site in Fairview Township for 67 single-family homes.

County recommendation: Consistent with county plan

Engineer / designer
Integrated Consulting
Plan type
Preliminary Subdivision
Land use
Single-family
Water
Public water
Sewer
Public sewer

Filing history

  • 2026-04-21 · #26-0070 · Preliminary Subdivision · 67 lots/units

County plan review office →

The full picture AI research · Nov 1, 2026

County planning records show a proposal to divide a 71.2-acre site in Fairview Township, York County, into lots for 67 single-family homes. The project is called Forge Haven Valley. That works out to roughly one home per acre, counting all the land, including any roads, stormwater areas or open space.

The filing is a preliminary subdivision plan. This is an early step in which the township and county review the lot layout, streets and utilities before any construction approval. The records don't say what is on the site now, but a site this size is often farmland or open land. Integrated Consulting is the only firm named on the filing.

No news coverage, meeting agendas, developer page or permit records specific to this project were found online. The details above come from the county record alone.

What it could mean nearby

Where it stands

The county's most recent filing, dated 2026-04-21, is for preliminary subdivision review. Next steps usually include township and county planning review, possible revisions, a vote by the township supervisors, and then final plan approval and permits before construction.

Want to weigh in? Subdivision plans are normally decided by the Fairview Township supervisors after planning commission review. Residents can usually comment at those public meetings, and the township office can confirm the dates.

Planning terms explained
Preliminary subdivision plan
An early-stage drawing that shows how land would be split into lots and streets, which the township reviews before final approval.
Subdivision
The division of one larger parcel of land into smaller lots for building or sale.
Stormwater management
Features such as basins and drains that control rainwater runoff from new roofs and pavement.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $37.5M