PlannedNearby

Montgomery County · Limerick · MCPC #16-0046-004

Buckman Facility Expansion

105 Airport Rd and 679 W Ridge Pike, Limerick, PA · 110,950 sq ft non-residential, warehouse · 85.44 acres

About this project

Buckman Enterprises, LLC proposes two new buildings on land across Airport Road from Limerick Airport in Limerick Township. The main building would hold office, lab, process, and storage space, and the second would be for salt storage with room reserved for later expansion. A lot line change would shift land between the two parcels so both buildings sit on one of them.

County planning commission: Supports, with comments

Issues raised: Gross acreage transferred between parcels does not clearly match, High-intensity vegetative buffer needed along neighboring homes, Stormwater basin planting with trees and possibly warm-season grasses

Applicant
Buckman Enterprises, LLC
Zoning
O/LI
Approvals needed
subdivision and land development, lot line adjustment

Filing history

  • 2025-07-08 · MCPC #16-0046-004 · Land Dev Plan, SubDiv Plan, Prelim Plan · 110,950 sq ft
  • 2021-12-21 · MCPC #16-0046-003 · Prelim Plan
  • 2020-03-03 · MCPC #16-0046-002 · Land Dev Plan, Prelim Plan · 45,200 sq ft
  • 2016-02-22 · MCPC #16-0046-001 · Land Dev Plan, Prelim Plan · 55,695 sq ft

County review letters
2025-07-08 · LIMER 16-0046-004r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Buckman Enterprises, LLC has filed plans to build two new buildings on land across Airport Road from Limerick Airport in Limerick Township. The county lists the project at about 110,950 square feet of non-residential space on roughly 85 acres, classed as warehouse and storage.

The main building would hold offices, a lab, process areas and storage. The second would store salt and leave room for later expansion. A lot line change would move land between the two parcels so both buildings sit on one of them.

No news coverage, township agenda items or developer project page specific to this project were found. The county records are the only basis for this description. The records do not say what is on the site now, so that is left out.

What it could mean nearby

Where it stands

The county's latest filing is dated 2025-07-08. No township approval or denial was found online. Plans like this usually go to the township planning commission and then the supervisors for review, and the supervisors vote on approval.

Want to weigh in? The Limerick Township Board of Supervisors likely decides, after the planning commission reviews it. Residents can usually comment at those public meetings, and agendas are posted on the township website.

Who's behind it

Buckman Enterprises, LLC

Planning terms explained
Lot line change
Moving the boundary between two neighboring parcels without creating a new lot.
Land development
A township review of plans to build on a site, covering things like buildings, parking, stormwater and access.
Planning commission
A volunteer board that reviews development plans and advises the elected supervisors.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $14.4M