Montgomery County · Worcester · MCPC #17-0040-008
Meadowood Campus - Healthcare Northeast Expansion
3205 Skippack Pike, Worcester, PA · 32,625 sq ft non-residential, institutional · 137.0 acres
About this project
Meadowood Corporation is building a three-story expansion of its existing health center on the campus at 3205 Skippack Pike in Worcester Township. The project reconfigures parking and loading areas, adds walkways, an accessible ramp, a cooling tower, and an underground stormwater detention facility, and cuts into a steep slope for a retaining wall up to about 10 feet tall.
County planning commission: Supports, with comments
Issues raised: Retaining wall cuts into 45% to 50% steep slopes, Removal of mature trees reduces canopy coverage, Net increase of 4,755 sq ft impervious surface, Loading and parking layout could be reconfigured to reduce wall size, Screening needed for adjacent residential buildings, Conflicts with steep slope goals in comprehensive plans
- Applicant
- Meadowood Corporation
- Engineer / rep.
- Woodrow & Associates, Inc.
- Zoning
- LPD
- Approvals needed
- final land development plan approval
Filing history
- 2025-07-25 · MCPC #17-0040-008 · Land Dev Plan, Prelim Plan, Resubmission · 32,625 sq ft
- 2025-02-07 · MCPC #17-0040-007 · Land Dev Plan, Prelim Plan · 32,670 sq ft
- 2025-02-07 · MCPC #17-0040-007 · Land Dev Plan, Prelim Plan · 32,670 sq ft
- 2020-01-27 · MCPC #17-0040-004 · Prelim Plan
- 2019-10-04 · MCPC #17-0040-003 · Zoning Map Amend
- 2017-08-01 · MCPC #17-0040-002 · Land Dev Plan, Prelim Plan · 52 homes
- 2017-02-16 · MCPC #17-0040-001 · Land Dev Plan · 4,191 sq ft
County review letters
2025-02-07 · WORCE 17-0040-007r.pdf
2025-02-07 · WORCE 17-0040-007r.pdf
2025-07-25 · WORCE 17-0040-008r +.pdf
The full picture AI research
This project hasn't been researched yet. Request it and AI will look for news, township agendas and the builder's plans, then explain it in plain English.
Scope estimate for contractors
Estimated construction value: $11.4M
- ~108 roofing squares (assumes 3 stories)
- ~81 tons of cooling (rule of thumb 400 sq ft/ton)
- ~5.0 acres of site work (grading, stormwater, landscaping)
- Underground stormwater detention facility
- Large retaining wall up to about 10 feet high
- Cooling tower
- Utility relocation
- New pedestrian pathways and ADA accessible ramp
- Reconfigured parking and loading area with screen fencing and walls