PlannedNearby

Montgomery County · Towamencin · MCPC #17-0049-005

Core5 at Park 31 - Revision

505-525 Allentown Rd, Towamencin, PA · 587,367 sq ft non-residential, warehouse · 79.95 acres

About this project

CORE5 Industrial Partners wants to build three new warehouse buildings with a combined floor area of about 587,367 square feet at 505-525 Allentown Road in Towamencin Township. Montgomery County planners generally support the plan but want a wider shared-use path along Wambold Road.

County planning commission: Supports, with comments

Issues raised: Wambold Road shared-use path should be at least 10 ft wide, preferably 12 ft

Applicant
CORE5 Industrial Partners, LLC
Engineer / rep.
Cornerstone Consulting Engineers & Design Services, Inc.
Zoning
LI
Approvals needed
final land development plan approval
Utilities
public water, public sewer

Filing history

  • 2024-11-14 · MCPC #17-0049-005 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 587,367 sq ft
  • 2019-09-12 · MCPC #17-0049-004 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 591,360 sq ft
  • 2018-07-16 · MCPC #17-0049-003 · Land Dev Plan, Sketch Plan · 583,635 sq ft
  • 2017-07-12 · MCPC #17-0049-002 · Land Dev Plan, SubDiv Plan · 642,425 sq ft
  • 2017-03-06 · MCPC #17-0049-001 · Land Dev Plan, SubDiv Plan · 671,520 sq ft

County review letters
2024-11-14 · TOWAM 17-0049-005r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

CORE5 Industrial Partners proposes three warehouse buildings totaling about 587,000 square feet on roughly 80 acres at 505-525 Allentown Road in Towamencin Township. This is a revision to an earlier plan, so the layout or details of an existing proposal are being updated.

County records do not say what is on the site now or who might occupy the buildings. Montgomery County planners generally support the plan. They want a wider shared-use path (a paved walking and biking trail) along Wambold Road.

A 2021 trade article describes a similarly named project, Core5 Logistics Center at Park 31 in the Souderton area. It was a speculative project of about 591,000 square feet on 74 acres, built without a named tenant. The article does not name a township, and its size and acreage differ from the county figures. It may be an earlier version of this plan, but that is not confirmed. No news coverage, meeting records or opposition specific to the Towamencin revision were found.

What it could mean nearby

Where it stands

The county planning review was filed on 2024-11-14, and county planners generally support the plan. Next, the township would usually review and vote on the revised plan. Any conditions, such as the wider path, would normally be settled before final approval and permits.

Want to weigh in? The Towamencin Township supervisors and planning commission would normally decide on the plan, and residents can usually comment at their public meetings, though no specific meeting was found.

Who's behind it

CORE5 Industrial Partners, LLC · An Atlanta-based industrial developer that builds speculative warehouse and logistics centers in Pennsylvania and other states.

Around the web

Planning terms explained
Land development plan
A detailed site plan showing the buildings, parking, roads and utilities that a township reviews before allowing construction.
Revision
An updated version of a plan that was already submitted.
Shared-use path
A paved trail separate from the road that people can walk or bike on.
Speculative building
A building constructed before a tenant has signed a lease.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $76.4M