Montgomery County · Upper Dublin · MCPC #19-0013-006
Wrigley Ridge Townhome Development
1635/1647 N Limekiln Pike, Upper Dublin, PA · 20 homes, townhomes · 2.81 acres
About this project
A 20-unit townhouse development is being built on 2.81 acres on Limekiln Pike in Upper Dublin. Four existing structures on the site will be demolished. The project includes one main vehicular access point on Limekiln Pike, internal roads with emergency access, guest parking spaces, and pedestrian connections to adjacent properties.
County planning commission: Supports, with comments
Issues raised: Garage and driveway design to improve streetscape aesthetics, Street tree placement and shade between driveways, Development on steep slopes (15–25%) with retaining wall concerns, Wide driveway crosswalk (75 feet long) design and pedestrian safety, Sidewalk buffer and tree placement along Limekiln Pike
- Applicant
- Commerce Pursuit Capital, LP
- Engineer / rep.
- Charles E. Shoemaker Inc.
- Zoning
- MD-Multiple Dwelling
- Approvals needed
- waivers
- Utilities
- public water, public sewer
- Demolition
- Four existing structures
Filing history
- 2025-12-16 · MCPC #19-0013-006 · Land Dev Plan, Prelim Plan, Resubmission · 20 homes
- 2024-10-21 · MCPC #19-0013-005 · Land Dev Plan, Sketch Plan · 22 homes
- 2022-09-21 · MCPC #19-0013-004 · Land Dev Plan, Sketch Plan, Resubmission · 22 homes
- 2022-06-24 · MCPC #19-0013-003 · Land Dev Plan, Sketch Plan, Resubmission · 22 homes
- 2021-06-07 · MCPC #19-0013-002 · Land Dev Plan, SubDiv Plan, Sketch Plan, Resubmission · 20 homes · 2,750 sq ft
- 2019-01-15 · MCPC #19-0013-001 · Land Dev Plan, SubDiv Plan, Sketch Plan · 22 homes · 2,200 sq ft
County review letters
2024-10-21 · UDUBL 19-0013-005r.pdf
2025-12-16 · UDUBL 19-0013-006r.pdf
Scope estimate for contractors
Estimated construction value: $7.4M
- ~280 roofing squares
- ~20 HVAC systems
- ~20 kitchens / 40+ bathrooms
- ~40,000 sq ft of finished living space
- ~2.8 acres of site work (grading, stormwater, landscaping)
- Limekiln Pike road widening (approximately 6 feet)
- Post-construction stormwater infiltration basins
- Emergency access road and pedestrian connections
- Demolition of four existing structures
- Landscaping plan with street trees and sidewalks