PlannedNearby

Montgomery County · Horsham · MCPC #19-0109-002

Sonoco Metal Packaging Building Addition

431 Privet Road, Horsham, PA · 86,640 sq ft non-residential, industrial · 15.46 acres

About this project

Sonoco Metal Packaging LLC plans to add an 86,640 sq ft wing to its existing industrial plant at 431 Privet Road in Horsham Township, on a site of about 15.5 acres. The work includes enclosed loading areas, a new parking lot between the building and Privet Road, and a 5-foot sidewalk along the road. A rear surface parking area will be removed and some paved ground will be turned back into grass. The county generally supports the plan, with comments.

County planning commission: Supports, with comments

Issues raised: Sidewalk partly outside right-of-way; waiver and possible public access easement, Tree protection fencing missing for mature trees near Privet Road, Sidewalk encroaches into drip lines of mature trees, Stormwater basin planned over an abandoned septic field, Soil compaction risk to infiltration rates during construction

Applicant
Sonoco Metal Packaging LLC
Zoning
I-2
Approvals needed
waiver from sidewalk placement requirement (Section 198-34.A.(3))
Demolition
Removal of a surface parking area toward the rear of the site

Filing history

  • 2024-11-04 · MCPC #19-0109-002 · Land Dev Plan, Prelim Plan · 86,640 sq ft
  • 2019-05-01 · MCPC #19-0109-001 · Land Dev Plan, Prelim Plan · 60,000 sq ft

County review letters
2024-11-04 · HORSH 19-0109-002r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Sonoco Metal Packaging LLC wants to add an 86,640-square-foot wing to its existing industrial plant at 431 Privet Road in Horsham Township. The site is about 15.5 acres. The addition would include enclosed loading areas.

The plan also reworks the site. A new parking lot would go between the building and Privet Road, and a 5-foot sidewalk would run along the road. A surface parking area at the rear would be removed, and some paved ground would be turned back into grass. The county generally supports the plan, with comments.

Online, the only project-specific item found was a Horsham Township meeting agenda from late 2024. It lists the addition as a land development application at its first review. No news coverage, opposition, approval decision or construction update was found.

What it could mean nearby

Where it stands

The plan was at an early review stage in the township's land development process, based on a late-2024 agenda and a county filing dated 2024-11-04. No later approval or construction news was found. Next steps usually include further township review, any required revisions, and a final approval vote before permits are issued.

Want to weigh in? Horsham Township's governing and planning bodies review land development plans at public meetings. Residents can comment there, and agendas are posted on the township website.

Who's behind it

Sonoco Metal Packaging LLC · A metal packaging business within Sonoco, a large packaging company that has expanded its metal packaging operations through acquisitions.

Around the web

Planning terms explained
Land development
A formal township review of a building addition or site change, covering things like parking, drainage and access.
Stormwater management
Systems that collect and slow rainwater runoff so it does not flood neighboring land or streams.
Impervious surface
Paved or built ground that does not soak up rain; converting it to grass reduces runoff.
County planning review
The county planning commission's advisory comments on a local plan; the township makes the final decision.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $11.3M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →