PlannedNearby

Montgomery County · Lower Gwynedd · MCPC #20-0225-004

1512 - 1524 Cedar Hill

CEDAR HILL, Lower Gwynedd, PA · 4 homes, single family · 7.78 acres

About this project

Four single-family homes are proposed on a 7.78-acre property in Lower Gwynedd that will be subdivided from two existing parcels. The homes will be served by public water and sanitary sewer with individual driveway access from Cedar Hill Road. A six-foot-wide pedestrian trail is planned instead of traditional sidewalks.

County planning commission: Supports, with comments

Issues raised: Open space design—rear-yard strips inadequate for intended purpose, Final recorded plan must remove obsolete open space notes, Pedestrian trail and sidewalk waiver standards

Applicant
Tisman Group, LLC
Engineer / rep.
STA Engineering, Inc.
Zoning
A-1 Residential District
Approvals needed
waivers, Conservation District approval, PennDOT HOP, PADEP approval
Utilities
public water, public sewer

Filing history

  • 2026-03-04 · MCPC #20-0225-004 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 4 homes
  • 2025-09-08 · MCPC #20-0225-003 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 4 homes
  • 2020-11-13 · MCPC #20-0225-001 · Land Dev Plan, SubDiv Plan, Prelim Plan · 12 homes

County review letters
2025-09-08 · LGWYN 20-0225-003r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Four new single-family homes are proposed on about 7.8 acres along Cedar Hill Road in Lower Gwynedd Township. The land is now two existing parcels, 1512 and 1524 Cedar Hill Road, each with an existing house. Township records say those houses would be demolished. The parcels would be combined and then split into four building lots.

The homes would use public water and sewer, and each would have its own driveway onto Cedar Hill Road. Each lot would manage its own stormwater. A six-foot-wide walking trail along the road frontage would replace regular sidewalks.

The developer is Tisman Group, LLC, and STA Engineering prepared the plans. Township records show the Planning Commission recommended an earlier version in October 2025. A revised plan went back to the Planning Commission in spring 2026 and then to the Board of Supervisors. No news coverage or organized opposition was found.

What it could mean nearby

Where it stands

The Board of Supervisors considered the revised plan on April 28, 2026, and the minutes record a unanimous vote on the revisions. A final decision and construction start were not confirmed in the sources found. After approval, the developer usually has to satisfy the approval conditions, get final permits, and then build.

Want to weigh in? The Lower Gwynedd Township Board of Supervisors decides subdivision approvals, and residents can comment at its public meetings or through the Planning Commission, whose agendas are on the township website.

Who's behind it

Tisman Group, LLC · Tisman Group is the applicant on the township subdivision file. No official company website was found.

Around the web

Planning terms explained
Subdivision
Dividing land into separate lots that can be built on or sold individually.
Lot consolidation
Merging existing parcels into one before they are divided again.
Planning Commission
An appointed local board that reviews plans and advises the elected supervisors.
Conditional approval
Approval that depends on the developer meeting listed requirements.
Stormwater management
Systems that collect and slow rainwater runoff so it does not flood neighbors or streams.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $2.2M