About this project

A developer plans to build 12 townhomes on about half an acre at 151 East Mount Vernon Street in Lansdale. The project would replace two existing duplexes on the site, which already has public water and sewer. The county planning commission generally supports the plan but asked for changes to how the stacked units are defined, a shared outdoor space for residents, and a decision on the future use of an adjacent alley.

County planning commission: Supports, with comments

Issues raised: Stacked townhome layout vs. code definition of single-family attached dwelling, Shared common space for residents, Future use of alley on southeast side of property

Applicant
4 County Line Road, LLC
Engineer / rep.
Holmes Cunningham Engineering
Zoning
Class C Residential
Approvals needed
building height variance, front yard setback variance, porch height variance, variance from time to obtain permits/CO, waivers
Utilities
public water, public sewer
Demolition
Two existing duplexes

Filing history

  • 2024-08-29 · MCPC #21-0013-002 · Land Dev Plan, Prelim Plan · 12 homes
  • 2021-01-11 · MCPC #21-0013-001 · Land Dev Plan, Prelim Plan · 6 homes

County review letters
2024-08-29 · LANSD 21-0013-002r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

A developer plans to build 12 townhomes on about half an acre at 151 East Mount Vernon Street in Lansdale. The homes would replace two duplexes now on the site. The site already has public water and sewer.

The Montgomery County planning commission generally supports the plan. It asked for three changes. The first is a clearer definition of how the stacked units are counted and arranged. The second is a shared outdoor space for residents. The third is a decision on what will happen to an adjacent alley.

No news coverage, developer project page, or borough agenda or minutes specific to this project turned up online. Whether anyone opposes it, and who the homes are meant for, is not publicly known from the sources found.

What it could mean nearby

Where it stands

The county planning commission reviewed the plan in its latest filing (August 2024) and is generally supportive, with requested changes. The next step is usually review by the Lansdale Borough Planning Commission and Borough Council, which then consider land development approval. No later action was found online.

Want to weigh in? Lansdale Borough Planning Commission and Borough Council decide next, and residents can usually comment at their public meetings, which are listed on the borough website.

Who's behind it

4 County Line Road, LLC · A company named on the county filing, alongside Holmes Cunningham Engineering. No public information on its other projects was found.

Planning terms explained
Land development
The formal approval process for building new structures on a site, including layout, access, utilities and stormwater.
Stacked units
Homes built partly above or below one another, rather than side by side with their own ground-to-roof walls.
County planning commission review
The county's advisory comments on a local project. They are not binding, and the borough makes the final decision.
Alley
A narrow service road behind or beside buildings, often used for parking access or trash pickup.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $4.4M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →