Montgomery County · Lower Salford · MCPC #22-0001-006
JPO Harleysville Tract
488 Harleysville Pike, Lower Salford, PA · 26 homes, townhomes · 9.15 acres
About this project
A 26-unit residential development of townhomes and triplexes will be built at 488 Harleysville Pike in Lower Salford on a 9.15-acre parcel, replacing the existing house and outbuildings. The project will include private roads with cul-de-sac access, two stormwater management facilities, and a public trail system running through preserved open space.
County planning commission: Supports, with comments
Issues raised: landscaping tree waiver requests, crosswalk location and ADA curb ramp alignment, additional tree planting around stormwater basins, building facade transparency requirements, trail easement and connection to Park Crossing system
- Applicant
- Orleans Conservancy Group Partners LP
- Engineer / rep.
- ARNA Engineering Inc.
- Zoning
- R-4
- Approvals needed
- landscaping waivers, trail easement, board approval for trail in-lieu of recreation area
- Utilities
- public water, public sewer
- Demolition
- house and outbuildings
Filing history
- 2026-03-04 · MCPC #22-0001-006 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 26 homes
- 2025-11-07 · MCPC #22-0001-005 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 26 homes
- 2024-08-23 · MCPC #22-0001-004 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 26 homes
- 2024-04-23 · MCPC #22-0001-003 · Land Dev Plan, SubDiv Plan, Sketch Plan, Resubmission · 26 homes
- 2023-11-14 · MCPC #22-0001-002 · Land Dev Plan, SubDiv Plan, Sketch Plan, Resubmission · 36 homes
- 2022-01-03 · MCPC #22-0001-001 · Land Dev Plan, SubDiv Plan, Sketch Plan · 30 homes
County review letters
2024-04-23 · LSALF 22-0001-003r.pdf
2024-08-23 · LSALF 22-0001-004r.pdf
2025-11-07 · LSALF 22-0001-005r.pdf
Scope estimate for contractors
Estimated construction value: $9.6M
- ~364 roofing squares
- ~26 HVAC systems
- ~26 kitchens / 52+ bathrooms
- ~52,000 sq ft of finished living space
- ~9.2 acres of site work (grading, stormwater, landscaping)
- 8-foot asphalt trail with public easement
- Two stormwater infiltration basins
- Private cul-de-sac road system with utilities
- Two-car garage per unit
- Optional walkout basements
- Wetland buffering and shade tree planting