PlannedNearby

Montgomery County · Abington · MCPC #22-0027-002

365 Cedar Road

365 Cedar Road, Abington, PA · 7 homes, single family · 4.08 acres

About this project

Seven new single-family homes are proposed at 365 Cedar Road in Abington Township, splitting the existing 4.08-acre property into seven lots. The existing house and its attached garage would be torn down to make room for them. Three underground stormwater detention basins are planned on two of the lots, and the site is served by public water and sewer.

County planning commission: Supports, with comments

Issues raised: Pedestrian connection from Glen Lane to Lincoln Lane, Crosswalk across Lincoln Lane at Cedar Road needs clarification, Landscaping, buffers and street trees should be provided

Zoning
R4
Tax parcel
30-00-07112-00-4
Utilities
public water, public sewer
Demolition
Existing single-family dwelling and its attached garage

Filing history

  • 2024-05-10 · MCPC #22-0027-002 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 7 homes
  • 2022-02-02 · MCPC #22-0027-001 · Land Dev Plan, SubDiv Plan, Prelim Plan · 8 homes

County review letters
2024-05-10 · ABING 22-0027-002r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Seven new single-family homes are proposed at 365 Cedar Road in Abington Township. The 4.08-acre property would be divided into seven building lots. The existing house and its attached garage would be torn down to clear the site.

Three underground stormwater basins are planned on two of the lots. These tanks hold rain runoff and release it slowly, so nearby streets and properties are less likely to flood. The site already has public water and sewer service.

Searches turned up no news coverage, developer project page or opposition tied to this project. Search snippets suggested a real estate listing and a township agenda that may mention it. Neither could be opened and checked, so neither is relied on here.

What it could mean nearby

Where it stands

The latest county filing is dated May 2024, which points to a subdivision and land development review by the township. Such reviews usually go through the planning commission and then the township's elected board, which can approve with conditions. After approval, the developer typically needs permits before demolition and construction start. The current status could not be confirmed from public web sources.

Want to weigh in? Abington Township's planning commission and board of commissioners normally review subdivisions at public meetings, and residents can usually comment there. Agendas are posted on the township website.

Planning terms explained
Subdivision
Dividing one parcel of land into smaller lots that can be built on or sold separately.
Land development plan
A detailed plan showing how a site will be built, including lots, roads, utilities and drainage.
Stormwater detention basin
A basin, here underground, that temporarily holds rainwater runoff and releases it slowly.
Preliminary and final approval
The two usual stages of subdivision approval: the first approves the general layout, and the second approves the finished detailed plans.
Public water and sewer
Service from a municipal or regional utility rather than a private well or septic system.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $3.9M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →