Montgomery County · Upper Merion · MCPC #22-0034-002
Dekalb Plaza - Cane's Chicken
320 West Dekalb Pike, Upper Merion, PA · 16,562 sq ft non-residential, retail · 15.5 acres
About this project
Kravco is proposing a Raising Cane's restaurant with two drive-thru lanes, a 3,500-square-foot medical building, and a 10,000-square-foot addition on the 15.5-acre Dekalb Plaza site at 320 West DeKalb Pike in Upper Merion Township. About 4.5 acres would be disturbed for the work, which includes parking, sidewalks, utilities, and changes to the stormwater basin near Route 202.
County planning commission: Supports, with comments
Issues raised: invasive Fire Dragon Eulalia Grass in landscape plan, reduced size of stormwater basin near Route 202, add green stormwater infrastructure such as bioswales, naturalize stormwater basin with native grasses and shrubs
- Applicant
- Kravco Company, LLC
- Engineer / rep.
- R.L. Showalter & Associates, Inc.
- Zoning
- SC
- Tax parcel
- 58-00-06112-00-4
- Cross street
- Pinecrest Lane
- Approvals needed
- land development plan approval
Filing history
- 2025-06-13 · MCPC #22-0034-002 · Land Dev Plan, Prelim Plan, Resubmission · 16,562 sq ft
- 2022-02-07 · MCPC #22-0034-001 · Land Dev Plan, Prelim Plan · 2,500 sq ft
County review letters
2025-06-13 · UMERI 22-0034-002r.pdf
The full picture AI research · Nov 1, 2026
Kravco, the owner of Dekalb Plaza, proposes three changes at the shopping center at 320 West DeKalb Pike in Upper Merion Township. The first is a Raising Cane's restaurant with two drive-thru lanes. The second is a medical building of about 3,500 square feet. The third is a 10,000-square-foot addition. County records list about 16,500 square feet of new commercial space in total.
The plaza sits on about 15.5 acres and is already an operating shopping center. About 4.5 acres would be disturbed during construction. The work includes parking, sidewalks, utilities and changes to the stormwater basin near Route 202.
No news coverage, hearing notices or approval decisions specific to this proposal were found online. An older township workshop record from 2020 shows the plaza was discussed for rezoning to a shopping center district.
What it could mean nearby
- A drive-thru restaurant could add car traffic and queuing near the plaza entrances on DeKalb Pike.
- A medical building and a building addition could bring new jobs and visitors to the plaza.
- Changes to the stormwater basin near Route 202 would affect how rain runoff is handled on and off the site.
Where it stands
A filing was made with the county on 2025-06-13. No approval or denial was found online. Township review usually comes next, covering the site plan and stormwater design, and then a decision by the township's elected board.
- Jun 13, 2025 Latest county planning filing for the project
- Aug 6, 2020 Township workshop discussed rezoning Dekalb Plaza to a shopping center district
Want to weigh in? Residents can comment at Upper Merion Township public meetings, such as the planning commission and the Board of Supervisors, and by contacting the township. Check the township website for agendas.
Who's behind it
Kravco Company, LLC · Kravco is a retail property owner and developer named on the filing as the proposer. Its other projects were not confirmed in this research.
Around the web
- Minutes August 6 2020 WorkshopUpper Merion Township · Aug 6, 2020Township workshop minutes show Dekalb Plaza was discussed for rezoning to a shopping center district. They do not mention the current proposal.
Planning terms explained
- Land development plan
- A detailed site plan that the township reviews for new buildings, parking, utilities and drainage.
- Stormwater basin
- A low area that collects and slowly releases rainwater so nearby streets and streams do not flood.
- Drive-thru lane
- A lane where customers order and pick up food from their cars.
- Disturbed area
- The ground that is dug up, graded or cleared during construction.
- Rezoning
- A formal change to the rules about what can be built on a piece of land.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $3.6M
- ~165 roofing squares (assumes 1 story)
- ~41 tons of cooling (rule of thumb 400 sq ft/ton)
- ~4.5 acres of site work (grading, stormwater, landscaping)
- Two-lane drive-thru restaurant
- Stormwater basin modification
- Bioswales and green stormwater infrastructure
- Native grass and shrub basin plantings
- Sidewalks, parking and utilities
- Landscaping