Montgomery County · Whitemarsh · MCPC #22-0175-003
501 Washington Street
501 Washington Street, Whitemarsh, PA · 64 homes, apartments · 4.3 acres
About this project
A 64-unit apartment development is proposed at 501 Washington Street in Whitemarsh, consisting of four four-story buildings with rear-entry garages and parking for all units. The site is located in the Schuylkill River floodway and subject to a 1% annual flood hazard, which county planners identified as a serious concern requiring flood mitigation planning.
County planning commission: Raises serious concerns
Issues raised: Property located in regulatory floodway and 1% annual chance flood zone, Public safety risk from Schuylkill River flooding, Emergency evacuation and access procedures required, Increased strain on local emergency services during flood events
- Applicant
- 501 Washington Street 2026, LLC
- Engineer / rep.
- T&M Associates, LLC
- Zoning
- HVY
- Utilities
- public water, public sewer
- Demolition
- existing structures
Filing history
- 2026-10-23 · MCPC #22-0175-003 · Land Dev Plan, Sketch Plan, Resubmission · 64 homes
- 2026-09-03 · MCPC #22-0175-002 · Land Dev Plan, Sketch Plan · 64 homes
- 2022-06-27 · MCPC #22-0175-001 · Land Dev Plan, Sketch Plan · 122,846 sq ft
County review letters
2026-09-03 · WHITE 22-0175-002r.pdf
2026-10-23 · WHITE 22-0175-003r.pdf
The full picture AI research · Nov 1, 2026
A developer proposes 64 apartments at 501 Washington Street in Whitemarsh Township. The county summary describes four four-story buildings on about 4.3 acres. Each building would have rear-entry garages, and every unit would have parking.
The site lies in the Schuylkill River floodway, the part of a floodplain that carries water during a major flood. It is also subject to a 1% annual flood hazard, meaning a flood with a 1-in-100 chance of happening in any year. County planners called this a serious concern. They said it needs a flood mitigation plan.
No news coverage, township agenda item, developer page or approval decision was found for this specific project. This explanation therefore rests on the county planning record alone.
What it could mean nearby
- Flooding is the main issue the county raised. Building in a floodway can affect how floodwater moves and how safe the residents would be.
- The 64 new apartments would add housing, with on-site parking for every unit and rear-entry garages.
- Traffic, school and utility effects were not described in the available records.
Where it stands
A county planning filing dated 2026-10-23 shows the project under review, with flood mitigation still to be addressed. Plans like this usually go through township review and possible zoning or land development approvals before any construction permits are issued.
- Oct 23, 2026 Latest county planning filing for the project
Want to weigh in? Whitemarsh Township's Board of Supervisors and Planning Commission normally review projects like this at public meetings, so residents can check the township's agenda page and comment there.
Who's behind it
501 Washington Street 2026, LLC · This is the project-specific company named on the filing. T&M Associates, LLC is also listed, but no public information was found about either firm's other work.
Planning terms explained
- Floodway
- The channel and nearby land that must stay clear so a river's floodwater can pass through.
- 1% annual flood hazard
- An area with a 1-in-100 chance of flooding in any given year, also called the 100-year floodplain.
- Flood mitigation
- Design measures that reduce flood damage or risk to a building and its neighbors.
- Land development plan
- A formal plan showing how a site will be built, including buildings, parking, stormwater and utilities.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $15.4M
- ~384 roofing squares
- ~64 HVAC systems
- ~64 kitchens / 128+ bathrooms
- ~64,000 sq ft of finished living space
- ~4.3 acres of site work (grading, stormwater, landscaping)
- Rear-entry garage parking system
- Entrance and emergency access driveways
- Flood mitigation design required
- Parallel parking spaces in addition to garages