PlannedNearby

Montgomery County · Lower Frederick · MCPC #22-0199-002

225 Big Road

225 Big Road, Zieglerville, PA 19492, Lower Frederick, PA · 29 homes, single family · 77.89 acres

About this project

JEP, LLC proposes a 29-home single-family subdivision on about 78 acres at 225 Big Road in Lower Frederick Township. A new road would run from Simmons Road to Big Road, with a cul-de-sac serving nine lots. The existing home on the tract would stay on its own estate lot, and the county planning commission generally supports the plan but wants changes to a planned walking trail.

County planning commission: Supports, with comments

Issues raised: Walking trail alignment conflicts with the 2024 settlement agreement, Trail grade of 20-25% on steep slope is too steep for a walking path, Insufficient buffer plantings near rear of lots 13-16, Trail easement connection to township trail network unresolved

Applicant
JEP, LLC
Engineer / rep.
Traffic Planning and Design, Inc.
Zoning
R-1
Tax parcel
38-00-02020-003
Cross street
Simmons Road

Filing history

  • 2025-08-19 · MCPC #22-0199-002 · Land Dev Plan, SubDiv Plan, Prelim Plan · 29 homes
  • 2022-08-02 · MCPC #22-0199-001 · Sketch Plan, Conditional Use · 29 homes

County review letters
2025-08-19 · LFRED 22-0199-002r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

JEP, LLC proposes a subdivision of about 78 acres at 225 Big Road in Zieglerville, Lower Frederick Township. The land would be divided into 29 lots for single-family homes. A new street would link Simmons Road and Big Road, and a cul-de-sac off it would serve nine of the lots.

The existing home on the property would stay on its own estate lot. The county planning commission generally supports the plan. It has asked for changes to a planned walking trail.

No news coverage, developer project page, or township agenda or minutes about this project turned up online. Details beyond the county filing could not be confirmed.

What it could mean nearby

Where it stands

The county planning commission has reviewed the subdivision plan and generally supports it. The latest county filing is dated 2025-08-19. Next, the township's planning commission and supervisors usually review the plan. They may impose conditions before granting preliminary and then final approval.

Want to weigh in? The Lower Frederick Township Board of Supervisors decides on subdivision plans, after the township planning commission reviews them. Residents can comment at their public meetings, and the township website lists the agendas.

Who's behind it

JEP, LLC

Planning terms explained
Subdivision
Dividing one large piece of land into smaller lots that can be built on or sold separately.
Cul-de-sac
A dead-end street with a circular turnaround at the end.
Estate lot
A lot set aside for an existing home, here the current house on the tract.
County planning commission review
The county gives advice on a plan, but the township makes the final decision.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $16.2M