Montgomery County · West Conshohocken · MCPC #23-0084-002
Innovation 611 - Data Center
Front Street, West Conshohocken, PA · 1,305,564 sq ft non-residential, data center · 60.0 acres
About this project
A data center complex will be developed on a 60-acre site on Front Street in West Conshohocken. The project includes a 3-story data center with offices, one office building, and two utility plants, totaling approximately 1.3 million square feet.
- Applicant
- Innovation 411 Fee Owner LLC
- Engineer / rep.
- Edward B. Walsh & Associates. Inc.
- Zoning
- HI
- Tax parcel
- 24-00-01508-00-7
- Cross street
- Balligomingo Road
- Approvals needed
- land development, conditional use, lot line change, special review
- Utilities
- public water, public sewer
Filing history
- 2026-10-21 · MCPC #23-0084-002 · Land Dev Plan, Prelim Plan · 1,305,564 sq ft
- 2023-05-01 · MCPC #23-0084-001 · Land Dev Plan, Prelim Plan · 791,000 sq ft
The full picture AI research · Nov 1, 2026
A developer proposes a data center campus on about 60 acres along Front Street in West Conshohocken. A data center is a large building full of computers that store and process online information. County records describe a 3-story data center with offices, a separate office building, and two utility plants. Together they total roughly 1.3 million square feet.
The records do not say what is on the site now. One online tracker calls the site an "Old Quarry Site" and lists the same owner entity, Innovation 411 Fee Owner LLC. That listing is unverified, and it gives no size, tenant or approval details.
No news coverage, meeting minutes or hearing notices about this exact project were found. Reporting on the same developer's data center plans in neighboring Upper Merion Township shows they have drawn heavy scrutiny and a rejection there. That is background only, not a decision on this site.
What it could mean nearby
- Size: at about 1.3 million square feet, the project would be a very large building complex for a small borough.
- Utilities: the two on-site utility plants suggest heavy power demand. The records give no figures for electricity, water or noise.
- Traffic, jobs, schools and open space: the county records and sources found say nothing on these, so impacts are unknown.
Where it stands
A filing was made with the county as recently as 2026-10-21, so the plan is at an early, proposed stage. No approvals or hearings were found. Next steps usually include borough zoning and land-development review, a public hearing, and state environmental permits.
- Oct 21, 2026 Latest county planning filing for the project
- Oct 2026 An online data center tracker added a West Conshohocken "Old Quarry Site" listing under the same owner entity
Want to weigh in? West Conshohocken's borough council and planning and zoning bodies would likely handle local review, and the borough council meets monthly. Residents can comment at public meetings and hearings once the project is on an agenda.
Who's behind it
Innovation 411 Fee Owner LLC · The owner entity named on the filing; an online tracker links it to MLP Ventures, a developer that has also proposed data centers in neighboring Upper Merion Township. Edward B. Walsh & Associates, Inc. is also named on the filing.
Around the web
- Old Quarry Site Data Center (Innovation 411 Fee Owner LLC, West Conshohocken)More Than Just Parks Data Center Tracker · Oct 19, 2026Lists a proposed West Conshohocken data center under the same owner entity and ties it to MLP Ventures, with no size or approval details and unverified data.
- How Pennsylvania Governor's Office Helped Push for Huge Data Centers in the Philadelphia SuburbsDeSmog · Aug 7, 2026Reports that the developer proposed data centers at multiple sites across Upper Merion and West Conshohocken, giving regional context.
Planning terms explained
- Land development
- The formal local review of a site plan for new buildings, roads, parking and drainage.
- Zoning
- Local rules that control what kinds of buildings and uses are allowed on a piece of land.
- Utility plant
- A support building that holds equipment such as power or cooling systems for the main buildings.
- Zoning hearing board
- An independent local panel that holds hearings on zoning exceptions and appeals.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $913.9M
- ~4,351 roofing squares (assumes 3 stories)
- ~3,263 tons of cooling (rule of thumb 400 sq ft/ton)
- ~60.0 acres of site work (grading, stormwater, landscaping)
- 2 central utility plants
- Sewer coordination with municipal authority required
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →