PlannedNearby

Montgomery County · Montgomery · MCPC #23-0134-003

The Village Land Development

511-521 Stump Road, Montgomery, PA · 25 homes, 3,600 sq ft non-residential, mixed use · 6.05 acres

About this project

The Village, a roughly 6-acre shopping center at 511-521 Stump Road in Montgomery Township, would get a new two-story building with medical offices and apartments on its southern parking area. Apartments would also go on the second floors of two existing buildings on the site. The restaurant building stays as it is, and no existing structures are being removed.

County planning commission: Supports, with comments

Issues raised: Township future land use map shows area as Commercial, Encourage update to future land use map if mixed-use succeeds, Montco 2040 streetscape features: shared driveways, sidewalks, screening walls, signage

Engineer / rep.
Woodrow & Associates, Inc.
Zoning
S
Tax parcel
46-00-03482-00-9
Cross street
Orchard Drive
Approvals needed
zoning text amendment, conditional use

Filing history

  • 2024-02-16 · MCPC #23-0134-003 · Land Dev Plan, Prelim Plan · 25 homes · 3,600 sq ft
  • 2023-10-17 · MCPC #23-0134-002 · Sketch Plan, Conditional Use · 25 homes · 3,600 sq ft

County review letters
2024-02-16 · MONTG 23-0134-003r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

The Village is an existing shopping center of about 6 acres at 511-521 Stump Road in Montgomery Township. The plan would add a new two-story building on the southern parking area, with medical offices and apartments. Apartments would also be added on the second floors of two existing buildings.

In all, the county lists 25 new homes and about 3,600 square feet of non-residential space. The restaurant building would stay as it is, and no existing buildings would be torn down. A leasing listing describes the center as about 56,000 square feet of retail and office space with parking for 320 cars.

The township's land development page lists the project as a proposed mixed-use complex. In February 2024 the township supervisors voted 3-1 on a sewage-planning step for it. No news coverage, opposition or named tenants were found.

What it could mean nearby

Where it stands

The county's latest filing is dated February 2024, and the township's land development page lists a date of September 9, 2024 for the project. That page's wording was unclear, so final approval is not confirmed. No construction or occupancy news was found. After land development approval, a project usually needs building permits before construction can start.

Want to weigh in? The Montgomery Township Board of Supervisors decides on land development plans, and residents can comment at its public meetings or by contacting the township.

Who's behind it

Woodrow & Associates, Inc. · Named on the county filing, most likely as the engineering or design firm. Nothing further was found about the company or the property owner.

Around the web

Planning terms explained
Land development
The township's formal review of a plan to build or change buildings, parking and utilities on a site.
Mixed use
A project that combines different uses, such as homes, offices and shops, on one site.
Sewage Facilities Planning Module
A state-required form showing how a project's wastewater will be handled.
Board of Supervisors
The elected body that governs a Pennsylvania township and votes on development plans.
Shopping center district
A zoning category for shopping areas. The township's rules allow apartments above shops there as a mixed-use complex.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $14.9M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →