Montgomery County · Hatfield Township · MCPC #23-0236-002

Kerr Property

2544 Trewigtown Road, Hatfield Township, PA · 6 homes, single family · 5.09 acres

About this project

A developer plans to divide the 5.09-acre parcel at 2544 Trewigtown Road in Hatfield Township into six lots, each with a single-family home. The homes will connect to public water and sewer, with driveways, utilities, and stormwater facilities. The county supports the plan but has a few comments for the township to consider.

County planning commission: Supports, with comments

Issues raised: Stormwater easement needs a record plan note granting township access for inspection and maintenance, Proposed 20-foot driveway width, deferred to township engineer

Applicant
Kerrstead Farm Family, LLC
Engineer / rep.
Schlosser & Clauss Consulting Engineers, Inc.
Zoning
RA1
Approvals needed
subdivision approval, flag lot relief (§282-203.B.(1)(c)), granted with conditions
Utilities
public water, public sewer

Filing history

  • 2025-07-10 · MCPC #23-0236-002 · Land Dev Plan, SubDiv Plan, Prelim Plan · 6 homes
  • 2023-11-27 · MCPC #23-0236-001 · Prelim Plan

County review letters
2025-07-10 · HATFT 23-0236-002r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

A developer plans to divide a 5.09-acre parcel at 2544 Trewigtown Road in Hatfield Township into six lots. Each lot would get one single-family home, so six new homes in all.

The homes would connect to public water and sewer. The plan also includes driveways, utilities and stormwater facilities, which are systems that manage rain runoff so it does not flood neighbors.

The county planning commission reviewed the plan and supports it. It offered a few comments for the township to consider. No news coverage, township meeting records or developer project page specific to this project were found online, so there is no public information on opposition, approvals or who will live there.

What it could mean nearby

Where it stands

The county filing dated July 10, 2025 shows the plan has been through county review, which was favorable. The township still has to review the subdivision. Its planning commission and supervisors usually take it up next, then the township decides on approval. Approval is usually followed by recording the final plan and applying for building permits.

Want to weigh in? The Hatfield Township planning commission and board of supervisors decide next, and residents can usually comment at their public meetings. Contact the township to confirm meeting dates.

Who's behind it

Kerrstead Farm Family, LLC · This is the landowner or applicant named on the filing. Schlosser & Clauss Consulting Engineers, Inc. is the engineering firm listed, and no public information on either company's other projects was found.

Planning terms explained
Subdivision
Dividing one parcel of land into separate lots that can be built on or sold individually.
Stormwater facilities
Basins, pipes or other features that collect and slow rainwater runoff from buildings and pavement.
Public water and sewer
Service from municipal utility systems instead of private wells and septic tanks.
County planning commission
A county body that reviews local development plans and sends advice to the township. The township makes the final decision.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $3.4M