PlannedNearby

Montgomery County · Franconia · MCPC #24-0034-001

West Broad Street School Expansion

342 W Broad Street, Franconia, PA · 17,000 sq ft non-residential, school · 23.8 acres

About this project

Souderton Area School District plans a 17,000 square foot addition to the existing West Broad Street school in Franconia Township, on a 23.8-acre site zoned institutional. The Montgomery County Planning Commission generally supports it but recommends safer pedestrian crossings at the driveway, a longer sidewalk along West Broad Street, and a crosswalk across the road to reach the trail on the property's edge.

County planning commission: Supports, with comments

Issues raised: Pedestrian safety at driveway crossing from West Broad Street, Crosswalks or raised crossings at north end of driveway circle, Sidewalk on West Broad Street not extended to property's south end, Access to trail on property edge, Crosswalk across West Broad Street for school and trail access

Zoning
INST

Filing history

  • 2024-02-07 · MCPC #24-0034-001 · Land Dev Plan, Prelim Plan · 17,000 sq ft

County review letters
2024-02-07 · FRANC 24-0034-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

The Souderton Area School District plans to add about 17,000 square feet to West Broad Street Elementary School at 342 W Broad Street in Franconia Township. The school sits on a 23.8-acre site zoned for institutional use.

According to township planning discussions, the addition would replace modular (temporary) classrooms. It is part of the district's long-range facilities plan, and the district said it does not expect more students as a result. The district also sought a variance (an exception to the rules) for an illuminated sign along West Broad Street.

The township supervisors gave conditional approval of the land development plans in April 2024. A school board news report indicates the district later awarded bids for the project. No organized opposition turned up in the sources found.

What it could mean nearby

Where it stands

The township supervisors granted conditional preliminary/final land development approval in April 2024, and the district has since moved toward construction bidding. Next steps are meeting the approval conditions, getting building permits and building the addition.

Want to weigh in? Residents can raise concerns with the Franconia Township Board of Supervisors and Planning Commission at their public meetings, or with the Souderton Area School Board.

Who's behind it

Souderton Area School District · The public school district that operates West Broad Street Elementary and other schools serving the Souderton area.

Around the web

Planning terms explained
Land development
A township review of plans for building or expanding on a property, covering things like layout, drainage and access.
Conditional approval
Approval that depends on the applicant meeting specific listed requirements.
Special exception
Permission for a use or change that zoning allows only if certain standards are met.
Variance
An approved exception to a zoning rule, such as one on sign size or lighting.
Institutional zoning
A zoning category meant for schools and similar public or community uses.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $6.0M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →