PlannedNearby

Montgomery County · Lower Gwynedd · MCPC #24-0122-004

Whitefield Homes

1348 SUMNEYTOWN PIKE, Lower Gwynedd, PA · 8 homes, single family · 15.6 acres

About this project

Whitefield Homes is seeking a conditional use permit for an 8-unit residential development on 15.6 acres at 1348 Sumneytown Pike in Lower Gwynedd Township.

Applicant
Whitefield Homes, LLC
Approvals needed
conditional use

Filing history

  • 2026-10-23 · MCPC #24-0122-004 · Prelim Plan, Conditional Use · 8 homes
  • 2026-06-01 · MCPC #24-0122-003 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 8 homes
  • 2024-09-09 · MCPC #24-0122-002 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 9 homes
  • 2024-05-17 · MCPC #24-0122-001 · Land Dev Plan, SubDiv Plan, Prelim Plan · 9 homes

County review letters
2024-05-17 · LGWYN 24-0122-001r.pdf
2024-09-09 · LGWYN 24-0122-002r_REVISED.pdf
2026-06-01 · LGWYN 24-0122-003r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Whitefield Homes, LLC wants to build eight single-family homes on about 15.6 acres at 1348 Sumneytown Pike in Lower Gwynedd Township. According to the township, six lots would be reached from a new dead-end street (cul-de-sac) off Sumneytown Pike. Two lots would face and have driveways on Evans Road. The homes would connect to public water and sewer.

The township's project page says the plan involves preserving a historic building on the property. The developer asked for flexibility on lot size and setback rules around that building. The township's Zoning Hearing Board approved that request, called a special exception, at an October 8 hearing. The developer has since filed revised plans and a conditional use application. The township page does not say what currently occupies the site. No news coverage or organized opposition was found.

What it could mean nearby

Where it stands

The plans are under review by the township, and the conditional use application has no hearing date listed yet. Next, the Board of Supervisors usually holds a public hearing on the conditional use, and the subdivision plan then goes through Planning Commission and supervisor review.

Want to weigh in? The Lower Gwynedd Board of Supervisors will decide the conditional use, and residents can comment at its public hearing once a date is posted on the township website.

Who's behind it

Whitefield Homes, LLC

Around the web

Planning terms explained
Conditional use
A use the zoning rules allow only after the governing body holds a hearing and finds the project meets set conditions.
Special exception
Permission from the Zoning Hearing Board for something the zoning code allows in certain cases, such as reduced lot requirements around a historic building.
Subdivision
Dividing one property into separate lots that can be built on and sold.
Setback
The minimum distance a building must be from a road or property line.
Cul-de-sac
A dead-end street that ends in a circular turnaround.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $4.5M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →