Montgomery County · Upper Merion · MCPC #24-0238-002

900 First Ave. Building Addition

900 First Ave., Upper Merion, PA · 16,196 sq ft non-residential, industrial · 29.85 acres

About this project

Arkema (also filed as Atofina Chemicals) proposes an addition of about 16,000 square feet, plus a 600-square-foot security building, at its 900 First Avenue site in Upper Merion Township. The work sits on part of a 29.85-acre property and includes new sidewalks and a rain garden to manage stormwater.

County planning commission: Supports

Issues raised: Board Of Commissioners, Ontgomery Cou, Montgomery County, Executive Director, Background, Comprehensive Plan Compliance

Applicant
Atofina Chemicals Inc. a/k/a Arkema Inc.
Engineer / rep.
Bohler Engineering
Zoning
KPMU
Tax parcel
58-00-06826-00-1
Cross street
First Avenue and Clark Avenue; First Avenue and Park Avenue
Approvals needed
waiver: 10-inch PVC stormwater pipe, waiver: simultaneous preliminary and final land development review, waiver: traffic impact study, waiver: map scale

Filing history

  • 2024-12-09 · MCPC #24-0238-002 · Land Dev Plan, Prelim Plan · 16,196 sq ft
  • 2024-11-05 · MCPC #24-0238-001 · SubDiv Plan, Prelim Plan

County review letters
2024-11-05 · UMERI 24-0238-001r.pdf
2024-12-09 · UMERI 24-0238-002r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Arkema, a chemical company, proposes adding about 16,000 square feet to an existing building at its 900 First Avenue campus in Upper Merion Township. It also proposes a small security building of about 600 square feet. The work covers only part of a 29.85-acre property that already holds the company's King of Prussia research and office operations.

The plans include new sidewalks and a rain garden. A rain garden is a planted dip that soaks up runoff from roofs and pavement.

Township records show the plan went to the Planning Commission in December 2024 and to the Board of Supervisors in June 2025. An online development tracker says the addition was approved 3-2. That tracker is an automated aggregator, and the township's official minutes were not found to confirm the vote. No news coverage or opposition was found.

What it could mean nearby

Where it stands

The Board of Supervisors considered the land development plan in June 2025, and an unofficial tracker reports approval. After approval, the company usually has to meet any conditions and get building and stormwater permits before construction starts.

Want to weigh in? The Upper Merion Township Board of Supervisors decides land development plans, and agendas and meeting information are posted on the township website; if the plan was already approved, comment opportunities may have passed.

Who's behind it

Arkema Inc. (also filed as Atofina Chemicals Inc.) · Arkema is a specialty-materials and chemicals company that runs its U.S. headquarters and research operations in King of Prussia and has other U.S. sites, including one in Chester.

Around the web

Planning terms explained
Land development plan
A detailed site plan the township reviews before a new building or addition is allowed.
Preliminary/final approval
A combined review step in which the township approves the plan in one action instead of two.
Waiver
Permission to skip or modify a specific township design rule.
Rain garden
A planted low area that collects and soaks in stormwater runoff.
KPMU zoning district
The King of Prussia mixed-use zoning area that covers the site.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $2.1M