221 Moredon Road Residential Subdivision

221 Moredon Road, Abington, PA · 4 homes, single family · 5.24 acres

About this project

The owner is splitting a 5.24-acre property at 221 Moredon Road in Abington into four lots, with a new cul-de-sac serving four single-family homes. The site now holds an older two-story masonry building, a detached garage, and two small one-story buildings.

County planning commission: Supports, with comments

Issues raised: Stone culvert under Pennypack Trail may lack capacity for projected flows, Basin 3 spans two lots, so maintenance responsibility needs clarifying, Retaining wall at Basin 3 may be a tripping hazard, Sidewalk requested along Moredon Road, Foundation landscaping standard not yet shown, Tree count differs between plans (356 vs. 352); tree removal on steep slopes needs erosion care

Applicant
Peroli, LLC
Engineer / rep.
Cornerstone Consulting Engineers & Design Services, Inc.
Zoning
R1
Approvals needed
subdivision and land development approval, sewage facilities planning module approval
Utilities
public water, public sewer

Filing history

  • 2024-11-11 · MCPC #24-0243-001 · Land Dev Plan, SubDiv Plan, Prelim Plan · 4 homes

County review letters
2024-11-11 · ABING 24-0243-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

The owner of a 5.24-acre property at 221 Moredon Road in Abington plans to divide it into four lots. A new cul-de-sac (a short dead-end street with a circular end) would serve four new single-family homes.

The site now has an older two-story masonry building, a detached garage and two small one-story buildings. The county record doesn't say whether these would be kept or removed.

No news coverage, township meeting records, hearing notices or developer project page specific to this proposal were found online. The details here come only from the county planning filing, which was last updated on November 11, 2024. No opposition, approvals or future occupants were found.

What it could mean nearby

Where it stands

The project was last filed with the county on 2024-11-11, and no township decision was found online. Subdivisions like this usually go to the township planning commission for advice, then to the elected township body for a final vote on the plan.

Want to weigh in? Abington Township's planning commission reviews subdivisions and the Board of Commissioners makes the final decision, so residents can comment at their public meetings. Check the township's agendas for the date.

Who's behind it

Peroli, LLC · Peroli, LLC is named on the county filing, and Cornerstone Consulting Engineers & Design Services, Inc. is the engineering firm listed with it. No company website or other projects were found.

Planning terms explained
Subdivision
Dividing one piece of land into separate lots that can be sold or built on individually.
Cul-de-sac
A dead-end street with a circular turnaround at the end.
Planning commission
An advisory local board that reviews development plans and recommends action to the elected officials.
Board of Commissioners
Abington Township's elected governing body, which gives final approval to subdivision plans.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $2.2M