Montgomery County · Skippack · MCPC #25-0057-001
4315 Skippack Pike
4315 Skippack Pike, Skippack, PA · 3 homes, 6,820 sq ft non-residential, mixed use · 1.0 acres
About this project
Janet Lynn Ventures, LLC plans to tear down the existing house and the three-apartment building at 4315 Skippack Pike in Skippack Township and redevelop the roughly one-acre lot. The new site would have a commercial building with a design center and three apartments above it, a 2,000 sq ft commercial building, and a 2,000 sq ft garage/storage building, along with a new parking lot and sidewalks.
County planning commission: Supports, with comments
Issues raised: Periodic inspection of the stormwater level spreader
- Applicant
- Janet Lynn Ventures, LLC
- Engineer / rep.
- Bursich Associates, a division of Van Cleef Engineering
- Zoning
- GC
- Approvals needed
- preliminary/final land development approval, request for modification, time waiver
- Utilities
- public water, public sewer
- Demolition
- Existing primary dwelling and the accessory building used as three apartments
Filing history
- 2025-03-10 · MCPC #25-0057-001 · Land Dev Plan, Prelim Plan · 3 homes · 6,820 sq ft
County review letters
2025-03-10 · SKIPP 25-0057-001r.pdf
The full picture AI research · Nov 1, 2026
The developer plans to tear down the existing house and the three-apartment building on a roughly one-acre lot at 4315 Skippack Pike in Skippack Township. In their place it would build three new structures. The main one would be a commercial building with a design center on the ground floor and three apartments above. The other two would be a 2,000 sq ft commercial building and a 2,000 sq ft garage/storage building. The site would also get a new parking lot and sidewalks. County records list about 6,820 sq ft of non-residential space in total.
A township Planning Commission agenda from April 2025 lists an application for this address. It describes a design center with second-floor apartments and names a different company, W.B. Homes, Inc., as the applicant. No minutes, approvals, news coverage or public opposition were found.
What it could mean nearby
- The three apartments replace three existing apartments, so the number of homes on the lot stays about the same.
- A new parking lot and more commercial space could change driveway access and traffic on Skippack Pike. No traffic study was found.
- New sidewalks would add walking connections along the frontage.
Where it stands
The plan was on the township Planning Commission's agenda in April 2025 as a combined preliminary and final land development application, and the county filing is dated March 2025. No decision was found online. Next steps usually are Planning Commission review, a recommendation to the Board of Supervisors, and then a vote on approval.
- Apr 2025 Skippack Township Planning Commission agenda lists the application for review
- Mar 10, 2025 Latest county planning filing
Want to weigh in? The Skippack Township Planning Commission reviews the plan first, then the Board of Supervisors decides. Residents can comment at their public meetings, and agendas are posted on the township website.
Who's behind it
Janet Lynn Ventures, LLC · Janet Lynn Ventures, LLC is the developer named in county records. No company website or other projects were found.
Around the web
- PC Agenda 04/21/25Skippack Township · Apr 21, 2025Lists a land development application for a design center with second-floor apartments at 4315 Skippack Pike, under the name W.B. Homes, Inc.
Planning terms explained
- Land development
- A township review of a building project's layout, including parking, access, stormwater and utilities.
- Preliminary/final application
- A combined request that asks for both the early and the last plan approval in one step.
- Planning Commission
- An appointed local board that reviews development plans and advises the elected supervisors.
- Mixed use
- A project that combines homes with shops, offices or other businesses.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $3.5M
- ~96 roofing squares
- ~3 HVAC systems
- ~3 kitchens / 6+ bathrooms
- ~8,400 sq ft of finished living space
- ~22 roofing squares (assumes 3 stories)
- ~17 tons of cooling (rule of thumb 400 sq ft/ton)
- ~1.0 acres of site work (grading, stormwater, landscaping)
- New parking lot
- Five-foot wide sidewalks
- Stormwater facilities including a level spreader
- Public water and sewer service
- Landscaping
- Garage/storage building