Montgomery County · Skippack · MCPC #25-0060-001

Cornerstone Church of Skippack Addition

1326 Stump Hall Road, Skippack, PA · 10,884 sq ft non-residential, institutional · 22.05 acres

About this project

Cornerstone Christian Fellowship plans to build a roughly 10,884-square-foot addition onto its existing church at 1326 Stump Hall Road in Skippack Township, on a 22-acre site. The addition would go on the north side of the building, and the site already has parking, two stormwater basins, an on-lot septic system and a well. The plan retrofits the existing turf basin with water-quality features, and no existing buildings are removed.

County planning commission: Supports, with comments

Issues raised: Add shrubs to the detention basin in addition to the meadow mix, Possible need for additional sewer treatment if the addition adds a kitchen or more members

Engineer / rep.
Van Cleef Engineering (Bursich Associates division)
Zoning
R-1
Approvals needed
minor land development approval (Skippack Township Board of Supervisors), waiver of frontage improvements (Sec. 169-33.A(7)), time waiver, request for modification, development agreement, financial guarantee, stormwater operations and maintenance agreement
Utilities
on-lot sewage disposal (existing), private well (existing)

Filing history

  • 2025-03-12 · MCPC #25-0060-001 · Land Dev Plan, Prelim Plan · 10,884 sq ft

County review letters
2025-03-12 · SKIPP 25-0060-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Cornerstone Christian Fellowship, which runs Cornerstone Church of Skippack, plans an addition of about 10,900 square feet. It would go on the north side of the existing church at 1326 Stump Hall Road, near Skippack Pike. The minutes describe the current building as roughly 24,000 square feet.

The site covers about 22 acres. It already has parking, two stormwater basins, a private septic system and a well. No buildings would be torn down. The plan upgrades an existing grassy basin with features that clean runoff water.

The township planning commission reviewed the plans in February 2025. Its minutes show it voted unanimously to back the plans and a waiver of street-frontage improvements, which the township engineer supported because the addition is small. No news coverage or opposition was found.

What it could mean nearby

Where it stands

The township planning commission recommended approval in February 2025. The records found do not show a final approval or the start of construction. Next steps usually include the township supervisors' decision, then permits and construction.

Want to weigh in? The Skippack Township Board of Supervisors would typically decide next; residents can comment at its public meetings or by contacting the township.

Who's behind it

Cornerstone Christian Fellowship (Cornerstone Church of Skippack) · A church congregation in Skippack Township that owns and operates the site; its engineer is Van Cleef Engineering (Bursich Associates division).

Around the web

Planning terms explained
Land development
The township's formal review of building plans on a site, covering things like layout, drainage and access.
Waiver
Official permission to skip a particular township requirement, such as street improvements, when it makes little sense for the project.
Stormwater basin
A low area that collects rain runoff and releases it slowly so it does not flood neighbors.
On-lot septic system
A private wastewater system on the property, used where there is no public sewer.
Frontage improvements
Upgrades along a property's road edge, like sidewalks, curbs or widening.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $3.8M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →