Montgomery County · Skippack · MCPC #25-0060-001

Cornerstone Church of Skippack Addition

1326 Stump Hall Road, Skippack, PA · 10,884 sq ft non-residential, institutional · 22.05 acres

About this project

Cornerstone Christian Fellowship plans to build a roughly 10,884-square-foot addition onto its existing church at 1326 Stump Hall Road in Skippack Township, on a 22-acre site. The addition would go on the north side of the building, and the site already has parking, two stormwater basins, an on-lot septic system and a well. The plan retrofits the existing turf basin with water-quality features, and no existing buildings are removed.

County planning commission: Supports, with comments

Issues raised: Add shrubs to the detention basin in addition to the meadow mix, Possible need for additional sewer treatment if the addition adds a kitchen or more members

Engineer / rep.
Van Cleef Engineering (Bursich Associates division)
Zoning
R-1
Approvals needed
minor land development approval (Skippack Township Board of Supervisors), waiver of frontage improvements (Sec. 169-33.A(7)), time waiver, request for modification, development agreement, financial guarantee, stormwater operations and maintenance agreement
Utilities
on-lot sewage disposal (existing), private well (existing)

Filing history

  • 2025-03-12 · MCPC #25-0060-001 · Land Dev Plan, Prelim Plan · 10,884 sq ft

County review letters
2025-03-12 · SKIPP 25-0060-001r.pdf

View all filings on the county site →

Scope estimate for contractors

Estimated construction value: $3.8M