PlannedNearby

Montgomery County · East Norriton · MCPC #25-0102-001

Frederick Tract

3100 Butchers Lane & 3111 Hannah Avenue, East Norriton, PA · 4 homes, single family · 8.06 acres

About this project

The owners are splitting two existing parcels on Butchers Lane and Hannah Avenue in East Norriton, about 8 acres total, into five new lots. County records list four homes for the site, and the lots would front on Hannah Avenue and Butchers Lane. No site improvements are proposed yet, and the county flagged a stream and floodplain that run through the land.

County planning commission: Supports, with comments

Issues raised: Floodplain and alluvial soils must meet township floodplain rules, Stream corridor should be protected during and after construction, Buffers needed for woodlands and other sensitive features, Minimize tree loss during construction (tree preservation), Street tree requirements along existing streets, Sidewalk requirements along the streets

Engineer / rep.
Horizon Engineering
Zoning
AR
Tax parcel
33-00-01196-002
Cross street
Kory Lane
Approvals needed
subdivision approval

Filing history

  • 2025-05-13 · MCPC #25-0102-001 · Land Dev Plan, SubDiv Plan, Prelim Plan · 4 homes

County review letters
2025-05-13 · ENORR 25-0102-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

The owners of two existing properties, at 3100 Butchers Lane and 3111 Hannah Avenue in East Norriton, want to divide them into five new lots. Together the land covers about 8 acres. County records list four new single-family homes for the site. The lots would face Hannah Avenue and Butchers Lane.

No construction or site work is proposed at this stage. The filing is only about dividing the land. The county noted that a stream and floodplain run through the property. Those features could limit where homes can go and may require extra environmental review.

No news coverage, meeting agendas, or developer pages specific to this project were found online. The details here come from the county planning record alone.

What it could mean nearby

Where it stands

The project is at an early stage. A land-division (subdivision) plan was filed with the county, most recently on 2025-05-13, and no site improvements are proposed yet. Usually the township planning commission and governing body review the plan next, and a later phase covers engineering, stormwater and any floodplain permits.

Want to weigh in? East Norriton Township's planning commission and board of supervisors usually review subdivisions, and residents can typically comment at their public meetings; check the township website for agendas.

Who's behind it

Horizon Engineering · Horizon Engineering is the firm named on the county filing; no further information about it was confirmed.

Planning terms explained
Subdivision
The legal process of splitting one or more parcels of land into separate lots.
Floodplain
Low-lying land next to a stream that is likely to flood in heavy rain, where building is restricted.
Site improvements
Work such as roads, utilities, drainage and grading needed to make lots ready for building.
Lot frontage
The side of a lot that faces a public road, which determines how it is accessed.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $2.2M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →