A 205-unit, 6-story apartment building is proposed to replace an existing office building on this 6.85-acre site in Upper Merion Township. The development will include parking, sidewalks, utilities, landscaping, and stormwater management systems.

County planning commission: Supports, with comments

Issues raised: tree removal and replacement requirements need verification and adjustment, pedestrian access from building to Arnold Road sidewalks through parking lot is unsafe and inaccessible, connectivity to Schuylkill River West Trail and county-wide trail network should be considered, opportunity to include affordable workforce housing units through density bonus

Applicant
Greystar Development East, LLC
Engineer / rep.
Bohler Engineering PA, LLC
Zoning
KPMU
Approvals needed
land development plan approval
Utilities
public water, public sewer
Demolition
existing office building (approximately 88,000 square feet)

Filing history

  • 2026-01-19 · MCPC #25-0121-002 · Land Dev Plan, Prelim Plan · 205 homes
  • 2025-06-10 · MCPC #25-0121-001 · Prelim Plan, Conditional Use · 205 homes

County review letters
2025-06-10 · UMERI 25-0121-001r.pdf
2026-01-19 · UMERI 25-0121-002r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Greystar, a national apartment developer, proposes to tear down an office building at 720 Vandenburg Road in King of Prussia. In its place it would build a six-story apartment building with 205 homes on about 6.85 acres. The plans also include parking, sidewalks, utilities, landscaping and stormwater controls.

The site now holds an office building. A September 2025 news report said a government contractor leases it and that the lease is nearly up. The developer's application calls the building outdated for today's office market. The report also described a pool, a clubhouse and a surface parking lot of roughly 300 spaces. No organized opposition was found in the sources reviewed.

Township agendas show the project going through a conditional use application and a land development plan review in 2026.

What it could mean nearby

Where it stands

Township agendas from spring and summer 2026 list a conditional use application and a land development plan for the site, but no final approval was confirmed in the sources found. Typical next steps are a decision by the township supervisors, then final plan approval, permits and demolition before construction.

Want to weigh in? The Upper Merion Township Board of Supervisors makes the next decisions on the conditional use and land development plan. Residents can comment at its public meetings, and agendas are posted on the township website.

Who's behind it

Greystar Development East, LLC · Greystar is a large residential real estate company that develops and manages apartments, and it already operates other communities in King of Prussia.

Around the web

Planning terms explained
Conditional use
A use the zoning code allows only after the township supervisors hold a hearing and confirm it meets set conditions.
Land development plan
Detailed site plans showing buildings, parking, utilities and stormwater, which the township must approve before building.
KPMU zoning
The King of Prussia Mixed Use district, which allows a combination of residential, office and commercial uses.
Stormwater management
Systems that collect and slow rain runoff so it does not cause flooding or pollute streams.
Preliminary/final plan
A single review that serves as both the first and the last plan approval, which speeds up the process.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $49.2M