PlannedNearby

Montgomery County · Upper Pottsgrove · MCPC #25-0128-001

Moosa - Poplar Street

Pottstown, PA, Upper Pottsgrove, PA · 30 homes, townhomes · 10.04 acres

About this project

Master Ventures, LLC plans to subdivide a 10-acre property on Farmington Avenue, north of Stone Hill Drive in Upper Pottsgrove Township, into 30 lots. Lots 1 through 28 would hold attached single-family homes, and lots 29 and 30 would hold detached single-family homes. The site would be served by public water and sewer, with 0.34 acres set aside as open space.

County planning commission: Supports, with comments

Issues raised: Stormwater basins do not meet the 50-foot setback from property lines and structures, Two detention basins span multiple lots, but township rules require basins on one parcel, Centrally located open space needs to be addressed, Vehicle and pedestrian access may need changes, Street trees may need to be addressed

Applicant
Master Ventures, LLC
Zoning
R-3
Approvals needed
subdivision and land development approval
Utilities
public water, public sewer

Filing history

  • 2025-06-17 · MCPC #25-0128-001 · Land Dev Plan, SubDiv Plan, Prelim Plan · 30 homes

County review letters
2025-06-17 · UPOTT 25-0128-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Master Ventures, LLC has proposed dividing a roughly 10-acre property on Farmington Avenue, north of Stone Hill Drive in Upper Pottsgrove Township, into 30 lots. Twenty-eight lots would hold attached single-family homes (townhomes). The last two would hold detached single-family houses.

Public water and sewer would serve the homes. About a third of an acre (0.34 acres) would be kept as open space.

The county records do not say what is on the site now. Township planning commission minutes from November 2025 appear to show a recommendation to grant Master Ventures a 180-day extension. This suggests the plan was still under review then. The excerpt did not name the project. No news coverage, opposition or approval was found, and nothing says who would live there.

What it could mean nearby

Where it stands

The latest county filing is dated June 2025, and the plan appears to be in township subdivision review. Next steps usually include a planning commission recommendation, a vote by the elected township board, and conditions on the final plan.

Want to weigh in? The Upper Pottsgrove Township planning commission and board of commissioners review subdivision plans at public meetings, and residents can comment there; agendas are posted on the township website.

Who's behind it

Master Ventures, LLC

Around the web

Planning terms explained
Subdivision
Dividing one piece of land into separate lots that can be built on or sold individually.
Attached single-family homes
Homes that each sit on their own lot but share one or more walls with neighbors, such as townhomes.
Open space
Land set aside from building, such as green space or a park.
Review extension
More time that a developer and a township agree to for reviewing a plan, which pauses the legal decision deadline.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $11.1M