St. Maria Goretti Parish Center

1601 Derstine Road, Hatfield Township, PA · 9,021 sq ft non-residential, institutional · 15.98 acres

About this project

Saint Maria Goretti Parish is proposing a new two-story parish center building at 1601 Derstine Road in Hatfield Township, about 9,000 square feet on roughly 0.88 acres of its 15.98-acre property. An existing convent building on the site would be demolished to make room for it. Public water and sewer already serve the location.

County planning commission: Supports, with comments

Issues raised: combined preliminary and final plan waiver, stormwater BMP designed without infiltration (0.0 rate), street tree planting waiver, net-land-area planting waiver

Applicant
Saint Maria Goretti Parish
Engineer / rep.
Gilmore & Associates
Zoning
ER and RA-1
Tax parcel
35-00-02191-00-6
Cross street
Cowpath Rd & Derstine Rd
Approvals needed
waiver: combined preliminary and final land development plan (§250-9.B.(5)), waiver: stormwater infiltration requirement (§242-14.B.(3)), waiver: street tree planting along existing street (§250-38.B.(1)), waiver: planting based on net land area (§250-38.C.(2))
Utilities
public water, public sewer
Demolition
Existing convent building

Filing history

  • 2025-08-28 · MCPC #25-0177-001 · Land Dev Plan, Prelim Plan · 9,021 sq ft

County review letters
2025-08-28 · HATFT 25-0177-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Saint Maria Goretti Parish plans a new two-story parish center at its campus at 1601 Derstine Road. County records describe a building of about 9,000 square feet on roughly 0.88 acres of the parish's 15.98-acre property. An existing convent building would be torn down to make room. Public water and sewer already serve the site.

The parish's own materials describe the center as a space for worship, social gatherings and service. They give a larger figure of about 15,500 square feet, so the final size may differ from the county filing. The same materials describe a fundraising campaign and a construction period of roughly 14 months, beginning with demolition of the convent. The center is meant to open before the end of 2028. No news coverage of opposition was found.

What it could mean nearby

Where it stands

Parish meeting notes from May 2026 say the land development process with the township is complete, and the parish is raising funds before construction. Construction would usually follow once funding is in place and building permits are issued.

Want to weigh in? The Hatfield Township Board of Commissioners handled the land development approval, and residents can raise questions at its public meetings or through the township office. The township's approval process appears to be complete.

Who's behind it

Saint Maria Goretti Parish · A Catholic parish in Hatfield, working with the engineering firm Gilmore & Associates on the site plans.

Around the web

Planning terms explained
Land development
The township's formal review of a plan to build or expand on a property, covering things like layout, drainage and access.
Deferral
A decision to postpone a requirement, such as building a sidewalk, to a later time.
Institutional use
A site used by a church, school or similar organization rather than for homes or shops.
Demolition
Tearing down an existing building, here the convent, before new construction starts.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.