Montgomery County · Whitemarsh · MCPC #25-0194-002
Quaker Park Redevelopment
1001 E Hector Street, Whitemarsh, PA · 146 homes, 2,556 sq ft non-residential, mixed use · 9.15 acres
About this project
The Quaker Park office complex at Hector and Lee Streets will be redeveloped with a five-story mixed-use building containing 106 apartments and ground-floor retail, plus 40 new townhomes; the laboratory building will be demolished and the existing office building will remain. The county supports this transit-oriented redevelopment but raises significant concerns about 12 townhomes proposed in the floodplain, which conflicts with county flooding mitigation goals.
County planning commission: Supports, with comments
Issues raised: Twelve townhomes proposed in 1% Annual Chance Flood Area conflict with comprehensive plan flooding mitigation goals, Floodplain development inconsistent with Montco 2040 strategy to limit development in floodplain
- Applicant
- BPG Office VI Quaker Park LP
- Engineer / rep.
- Langan Engineering and Environmental Services, Inc.
- Zoning
- Spring Mill Mixed-Use (SM-MU) District and Transit-Friendly Design Overlay (TDO-1)
- Tax parcel
- 65-00-03169-00-6
- Cross street
- E Hector Street and Lee Street
- Approvals needed
- zoning ordinance amendment, land development plan approval
- Utilities
- public water, public sewer
- Demolition
- Laboratory building (approximately 40,000 square feet)
Filing history
- 2026-04-20 · MCPC #25-0194-002 · Land Dev Plan, Sketch Plan · 146 homes · 2,556 sq ft
- 2025-09-19 · MCPC #25-0194-001 · Land Dev Plan, Sketch Plan · 115 homes · 5,400 sq ft
County review letters
2026-04-20 · WHITE 25-0194-002r.pdf
The full picture AI research · Nov 1, 2026
The Quaker Park office complex at Hector and Lee Streets in Whitemarsh Township would be redeveloped on about 9 acres. The plan calls for a five-story building with 106 apartments and ground-floor shops. It also calls for 40 new townhomes, which brings the total to 146 homes. The shops would total only about 2,500 square feet.
The laboratory building on the site would be torn down. The existing office building would stay. The county planning body supports building homes near transit. It has raised significant concerns about 12 of the townhomes, which are proposed in a floodplain, an area that can flood. It says this conflicts with county flood-reduction goals.
No news coverage, developer project page or meeting minutes specific to this project were found. The explanation rests on the county records.
What it could mean nearby
- Adds 146 homes near transit, which the county supports.
- Townhomes in the floodplain could face flood risk and could worsen flooding nearby, which is the county's main concern.
- Ground-floor retail is small, so it would add few shops or jobs.
- Traffic, school and utility effects were not described in the available records.
Where it stands
The county filed its latest review on 2026-04-20, so the plan is still under local review and no final approval was found. Next, the township would review the subdivision and land development plan. The developer may revise the plan to address the floodplain comments.
- Apr 20, 2026 Latest county planning filing, which supports the transit-oriented plan but flags floodplain townhomes
Want to weigh in? Whitemarsh Township's planning and governing boards usually decide land development plans at public meetings, and residents can comment there. Check the township website for agendas.
Who's behind it
BPG Office VI Quaker Park LP · The property-owning entity named on the county filing. Langan Engineering and Environmental Services, Inc. is also listed, and its role was not confirmed.
Planning terms explained
- Floodplain
- Low-lying land next to a stream or river that is likely to flood in heavy storms.
- Mixed use
- A project that combines homes with shops or offices on one site.
- Transit-oriented development
- Building homes and businesses close to train or bus service so that residents can rely less on cars.
- Land development plan
- The detailed site plan a municipality reviews and approves before construction can begin.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $82.4M
- ~4,672 roofing squares
- ~146 HVAC systems
- ~146 kitchens / 292+ bathrooms
- ~408,800 sq ft of finished living space
- ~5 roofing squares (assumes 5 stories)
- ~6 tons of cooling (rule of thumb 400 sq ft/ton)
- ~6.2 acres of site work (grading, stormwater, landscaping)
- Stacked townhomes
- Mixed-use building with ground-level retail
- Trail connection along Lee Street
- Stormwater management with low-impact development practices
- Parking facilities revision
- Laboratory building demolition