Montgomery County · East Greenville · MCPC #25-0211-001
241 Jefferson Street
241 Jefferson Street, East Greenville, PA · 16 homes, apartments · 0.51 acres
About this project
Green Tree Group Contracting LLC plans to convert the vacant two-story former knitting mill at 241 Jefferson Street in East Greenville into 16 apartments. A small two-story house and a shed at the rear will be torn down to make room for a surface parking lot, with the entrance on Jefferson Street and the exit on School Alley.
County planning commission: Supports, with comments
Issues raised: Stormwater management plan not yet provided, Recreation land requirement of about 24,000 sq ft (fee in lieu or waiver), Ramp locations relative to accessible parking not indicated, Impervious surface rising from 56% to 75% against a 50% limit
- Applicant
- Green Tree Group Contracting LLC
- Zoning
- R-2
- Approvals needed
- special exception (change of nonconforming industrial use to residential), variance (impervious surface), variance (buffer distances), possible recreation land fee in lieu or waiver
- Demolition
- Two-story frame dwelling house and a shed at the rear of the factory building
Filing history
- 2025-10-03 · MCPC #25-0211-001 · Land Dev Plan, Prelim Plan · 16 homes
County review letters
2025-10-03 · EGREE 25-0211-001r.pdf
The full picture AI research · Nov 1, 2026
Green Tree Group Contracting LLC has filed a plan to turn a vacant two-story former knitting mill at 241 Jefferson Street in East Greenville into 16 apartments. The site covers about half an acre (0.51 acres).
A small two-story house and a shed at the back of the property would be torn down. In their place the plan shows a surface parking lot. Cars would enter from Jefferson Street and leave onto School Alley.
No news coverage, meeting minutes, hearing notices or developer project page specific to this site were found online. Nothing is publicly known yet about opposition, approvals, or who the apartments are meant for. The county filing is dated October 3, 2025.
What it could mean nearby
- Traffic: cars would enter on Jefferson Street and exit on School Alley, which could add vehicle movements on both streets.
- Housing: the plan would add 16 apartments in a building that is vacant now.
- Land use: a surface parking lot would replace a small house and a shed at the rear of the property.
Where it stands
The project appears to be at the plan-review stage, based on a county filing from October 2025. No approval or decision was found online. Next steps usually include borough review of the plan, possible zoning relief, and then a vote by borough council.
- Oct 3, 2025 Latest filing for the project in county planning records
Want to weigh in? East Greenville Borough's planning commission and borough council normally review local development plans, and residents can comment at their public meetings. Agendas are typically posted on the borough's website.
Who's behind it
Green Tree Group Contracting LLC
Planning terms explained
- Adaptive reuse
- Converting an existing building, such as an old mill, to a new use like housing instead of tearing it down.
- Land development plan
- A detailed site plan that a municipality reviews and approves before construction on a property can begin.
- Surface parking lot
- An open-air parking area at ground level, as opposed to a garage.
- Zoning
- Local rules that set what uses and building sizes are allowed on each property.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $3.8M
- ~96 roofing squares
- ~16 HVAC systems
- ~16 kitchens / 32+ bathrooms
- ~16,000 sq ft of finished living space
- Interior conversion of the existing two-story former knitting mill
- New surface parking lot with entrance and egress drives
- Demolition of the existing two-story house and rear shed
- Stormwater management facilities (plan not yet submitted)
- Accessible entry and exit ramps at the building