Montgomery County · Montgomery · MCPC #25-0222-001
Costco Building Expansion
740 Upper State Road , Montgomery, PA · 17,402 sq ft non-residential, retail · 16.23 acres
About this project
Costco Wholesale is proposing to enlarge its existing warehouse store at 740 Upper State Road in Montgomery Township by adding about 17,400 square feet through three separate building extensions, one of which will house truck loading and unloading. The store sits on a roughly 16-acre site, and the parking lot and drainage areas would see only minor changes.
County planning commission: Supports
Issues raised: Board Of Commissioners, Comery, Montgomery County, Executive Director, Background, Comprehensive Plan Compliance, Recommendation/Conclusion
- Applicant
- Costco Wholesale Corporation
- Engineer / rep.
- Bohler Engineering PA, LLC
- Zoning
- ECPOD (Expressway Corridor Preservation Overlay District)
- Approvals needed
- three waivers for off-property site condition notations on the plan
- Utilities
- public water, public sewer
Filing history
- 2025-10-15 · MCPC #25-0222-001 · Land Dev Plan, Prelim Plan · 17,402 sq ft
County review letters
2025-10-15 · MONTG 25-0222-001r.pdf
The full picture AI research · Nov 1, 2026
Costco Wholesale proposes to enlarge its existing warehouse store at 740 Upper State Road in Montgomery Township, Montgomery County. The store, known as the Montgomeryville warehouse, sits on a site of about 16 acres.
County records describe about 17,400 square feet of new building space, added through three separate extensions to the current building. One extension would hold truck loading and unloading. The parking lot and drainage areas would change only slightly.
No news coverage, township agendas or minutes, or approval decisions specific to this expansion were found online. Costco's own store page lists the warehouse as open since 1999 but says nothing about the expansion. The details here come from the county records alone.
What it could mean nearby
- The records say the parking lot would change only slightly, so large changes to site access or parking are not indicated.
- One extension is for truck loading and unloading. Any effect on delivery traffic or noise has not been described in the sources found.
- Drainage areas would see minor changes, so stormwater handling would likely stay much as it is now.
Where it stands
The latest county filing is dated 2025-10-15, which suggests the plan is in township and county review. No approval or decision was found online. Next steps usually include township staff and engineer review, a planning commission discussion, and a vote by the elected township body.
- Oct 15, 2025 Latest county filing for the Costco building expansion
- Jul 10, 1999 Costco's store page lists this as the warehouse's opening date
Want to weigh in? The Montgomery Township planning commission and township supervisors would normally review land development plans at public meetings, so residents can check the township's posted agendas and comment there.
Who's behind it
Costco Wholesale Corporation · Costco Wholesale is a membership warehouse retailer that operates the existing Montgomeryville store; Bohler Engineering PA, LLC is the engineering firm on the filing.
Around the web
- Montgomeryville, PA warehouse locationCostco WholesaleConfirms the store's address at 740 Upper State Rd and its 1999 opening date, with no mention of an expansion.
Planning terms explained
- Land development
- A formal township review of building additions or new construction on a property, covering things like layout, stormwater and traffic.
- Building extension
- New floor area attached to an existing building, instead of a separate new building.
- Stormwater drainage
- The way rain runoff is collected and directed off a site so it does not cause flooding.
- Planning commission
- A local advisory board that reviews development plans and recommends action to the elected officials.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $3.8M
- ~174 roofing squares (assumes 1 story)
- ~43 tons of cooling (rule of thumb 400 sq ft/ton)
- ~1.6 acres of site work (grading, stormwater, landscaping)
- One building extension for truck loading and unloading
- Minor parking lot changes
- Minor drainage area changes
- Building footprint adjustments
- Stormwater management report revised 2025