Montgomery County · Towamencin · MCPC #25-0241-001
Project Hilltop
1440 Sumneytown Pike, Towamencin, PA · 141 homes, single family · 129.44 acres
About this project
Pinnacle Realty Development Company is proposing 141 single-family detached homes on about 129 acres at 1440 Sumneytown Pike in Towamencin Township. The homes would replace the former Freddy Hill Farms land, split into two sections divided by Kriebel Road, with roughly half the site kept as open space.
County planning commission: Supports, with comments
Issues raised: Limited western access from Kriebel Road, emergency-only connection, Excessively long cul-de-sac near Sumneytown Pike, Sidewalk locations need labeling and PennDOT coordination, School crosswalk connection to North Penn High School, Riparian buffer plantings to address stream erosion
- Applicant
- Pinnacle Realty Development Company, LLC
- Engineer / rep.
- S.T.A. Engineering, Inc.
- Zoning
- R-175
- Cross street
- Sumneytown Pike & Kriebel Road
- Approvals needed
- preliminary land development plan approval, R-14 cluster use
- Utilities
- public water
Filing history
- 2025-11-07 · MCPC #25-0241-001 · Land Dev Plan, SubDiv Plan, Prelim Plan · 141 homes
County review letters
2025-11-07 · TOWAM 25-0241-001r.pdf
The full picture AI research · Nov 1, 2026
Pinnacle Realty Development Company has proposed 141 single-family detached homes on about 129 acres at 1440 Sumneytown Pike in Towamencin Township. The land is the former Freddy Hill Farms. Kriebel Road divides it into two sections, and about half of the site would stay as open space.
The farm and its family fun center were announced in March 2025 to close after the 2025 season. The land was not protected farmland. A township planning summary describes an earlier, larger version of the plan with 210 homes, which suggests the proposal has been scaled back. Planning Commission discussions have covered road connections, whether one access should be for emergencies only, and improvements along Kriebel Road. No vote or approval was found.
What it could mean nearby
- Traffic and access: township discussions have focused on road connections to Kriebel Road and Sumneytown Pike, and on widening Kriebel Road shoulders and drainage work.
- Open space: roughly half of the site would remain open space under the county summary.
- New homes: 141 detached houses would replace a former farm and family attraction, ending the farm's recreational use.
- Schools and utilities: the sources found do not address these.
Where it stands
The plan appears to be in township review of its subdivision and land development plan, with the Planning Commission discussing it and the latest county filing dated 2025-11-07. Next usually come recommendations from the Planning Commission, then a decision by the township supervisors on preliminary and final plan approval.
- Nov 7, 2025 Latest county planning filing for the 141-home plan
- Mar 8, 2025 News report that Freddy Hill Farms and the fun center will close after the 2025 season
Want to weigh in? The Towamencin Township Planning Commission reviews the plan first and the Board of Supervisors decides; residents can comment at their public meetings, whose agendas are on the township website.
Who's behind it
Pinnacle Realty Development Company, LLC · The company is the developer proposing Project Hilltop; no official company site was found, so its other projects are unknown.
Around the web
- Planning Commission minutesTowamencin TownshipPlanning Commissioners discussed possible revisions to Project Hilltop, emergency versus full access, and Kriebel Road improvements.
- RIP Freddy Hill FarmsCrossing Broad · Mar 8, 2025Reported the farm's closure after the 2025 season and that the land was not protected farmland.
Planning terms explained
- Preliminary plan
- A detailed early-stage subdivision plan the township reviews before final approval.
- Subdivision and land development
- The township process for dividing land into lots and approving the roads, drainage and layout.
- Open space
- Land that stays undeveloped, such as fields, woods or trails.
- Emergency access
- A road connection reserved for fire and rescue vehicles rather than everyday traffic.
- Future Land Use Map
- A township map showing what uses it expects for each area over time.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $79.0M
- ~4,512 roofing squares
- ~141 HVAC systems
- ~141 kitchens / 282+ bathrooms
- ~394,800 sq ft of finished living space
- ~65.2 acres of site work (grading, stormwater, landscaping)
- New road extension connecting Canterbury Drive to Kriebel Road
- Emergency vehicle access drive
- Stormwater management and infiltration facilities
- Riparian buffer plantings and stream erosion control
- Possible sidewalks and crosswalk along Sumneytown Pike
- Wetland and floodplain areas within the site