PlannedNearby

Montgomery County · Limerick · MCPC #26-0042-001

Fruitville Crossing

3373 Ridge Pike, 3387 Ridge Pike, Montella Cir, and W Ridge Pike, Limerick, PA · 76 homes, 92,400 sq ft non-residential, mixed use · 15.6 acres

About this project

Piazza Realty Company is developing Fruitville Crossing, a mixed-use project at the Ridge Pike and Fruitville Road intersection in Limerick Township. The 15.6-acre site will have two office/retail buildings (92,400 sq ft total), 70 townhomes, and 6 single-family homes, with four existing buildings being demolished. The development includes internal roads, sidewalks, and stormwater management infrastructure.

County planning commission: Supports, with comments

Issues raised: Airport Overlay Zoning District compliance documentation required, high-visibility crosswalks needed at multiple driveways and road intersections

Applicant
Piazza Realty Company
Zoning
Main Street Base; Airport Overlay
Approvals needed
Airport Overlay Zoning District compliance, pedestrian infrastructure improvements
Demolition
four existing buildings

Filing history

  • 2026-02-24 · MCPC #26-0042-001 · Land Dev Plan, SubDiv Plan, Prelim Plan · 76 homes · 92,400 sq ft

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Fruitville Crossing is a mixed-use project proposed by Piazza Realty Company on about 15.6 acres at the corner of Ridge Pike and Fruitville Road in Limerick Township. County records describe two office and retail buildings totaling about 92,400 square feet, plus 70 townhomes and 6 single-family homes, which makes 76 new homes.

Four existing buildings on the site would be torn down. The plans also include new internal streets, sidewalks and stormwater controls, which are systems that manage rain runoff.

The only web item clearly tied to the project is a Limerick Township Planning Commission agenda. It lists a conditional use application from Piazza Realty Company for the Ridge Pike addresses. No news coverage, developer project page, or information on opposition or future tenants was found.

What it could mean nearby

Where it stands

The project appears to have reached township review. A conditional use application was on a Planning Commission agenda, apparently in January 2026, and the latest county filing is from February 2026. Next usually come a recommendation to the supervisors, a conditional use decision, and then subdivision and land development plan review.

Want to weigh in? Residents can comment at Limerick Township Planning Commission and Board of Supervisors public meetings; check the township website for agendas and hearing notices.

Who's behind it

Piazza Realty Company

Around the web

Planning terms explained
Conditional use
A use the zoning code allows only if the supervisors hold a hearing and decide the project meets set conditions.
Mixed use
A development that combines homes with shops or offices on one site.
Land development plan
Detailed site plans showing buildings, roads, utilities and drainage, reviewed by the township.
Stormwater management
Features such as basins that collect and slow rain runoff to limit flooding.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $66.6M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →