Montgomery County · Limerick · MCPC #26-0107-001
Lot 7 Industrial Parkway
Industrial Parkway, Limerick, PA · 19,440 sq ft non-residential, warehouse · 3.05 acres
About this project
Chesco Real Estate is proposing a self-storage facility with three unstaffed buildings totaling 19,440 square feet on a 3.05-acre parcel along Industrial Parkway in Limerick Township. The site will accommodate 36 parking spaces and includes perimeter landscaping and stormwater management facilities, with no water or sewer connections to the property.
County planning commission: Supports, with comments
Issues raised: Denote Airport Overlay District in zoning table, Require sidewalk along Industrial Parkway, Add continental crosswalk and ADA ramps across driveway, Establish employee contact protocol for emergency site access
- Applicant
- Chesco Real Estate
- Zoning
- O/LI
- Approvals needed
- sidewalk waiver
Filing history
- 2026-04-21 · MCPC #26-0107-001 · Land Dev Plan, Prelim Plan · 19,440 sq ft
County review letters
2026-04-21 · LIMER 26-0107-001r.pdf
The full picture AI research · Nov 1, 2026
Chesco Real Estate has proposed a self-storage facility on a 3.05-acre lot along Industrial Parkway in Limerick Township, Montgomery County. The plan has three storage buildings with a combined 19,440 square feet. The buildings would be unstaffed, so no on-site employees are expected.
The site would have 36 parking spaces, landscaping around the edges, and stormwater facilities to manage rain runoff. The county filing says the property would have no water or sewer connections.
The county records do not say what is on the lot now. A listing for an Industrial Parkway lot of about three acres in Limerick suggests it may be vacant industrial land, but that listing does not clearly match this project. No news coverage, meeting minutes, hearing notices or approvals specific to this project were found online.
What it could mean nearby
- Unstaffed storage buildings usually bring few daily trips, though the records give no traffic figures.
- With no water or sewer connections, the project would add little demand on public utilities.
- Perimeter landscaping and stormwater facilities are included in the plan, which are meant to soften the site's look and control runoff.
- The records show no new homes. Job creation looks minimal because the buildings are unstaffed.
Where it stands
A county planning filing was made on 2026-04-21. No township approval or decision was found online. Land development plans like this usually go to the township planning commission for review, then to the board of supervisors for a vote.
- Apr 21, 2026 Latest filing for the project in county planning records
Want to weigh in? The Limerick Township planning commission and board of supervisors would normally review the plan. Residents can comment at their public meetings, and agendas are posted on the township website.
Who's behind it
Chesco Real Estate
Planning terms explained
- Land development
- A formal township review of plans to build or expand buildings and site improvements on a property.
- Stormwater management
- Features such as basins that collect and slow rain runoff so it does not flood neighboring land.
- Unstaffed
- The buildings have no employees on site, and customers access their units themselves.
- Planning commission
- A volunteer township board that reviews development plans and advises the elected supervisors.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.5M
- ~194 roofing squares (assumes 1 story)
- ~48 tons of cooling (rule of thumb 400 sq ft/ton)
- ~3.0 acres of site work (grading, stormwater, landscaping)
- Unstaffed self-storage facility
- Stormwater infiltration basin
- Perimeter landscape buffer trees
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →