Deep Creek Road Subdivision

Deep Creek Road, New Hanover, PA · 9 homes, single family · 134.97 acres

About this project

A 134.97-acre property on Deep Creek Road in New Hanover is being subdivided into 10 single-family residential lots. Eight new homes will be built alongside the 2 existing homes that will remain on the property.

County planning commission: Supports, with comments

Issues raised: Septic and stormwater in floodplain and riparian buffers, Septic and stormwater on steep slopes, Flag lot stormwater basins

Engineer / rep.
Horizon Engineering
Zoning
R-2
Tax parcel
47-00-01160-008
Cross street
Parestis Road
Approvals needed
waivers
Utilities
on-lot septic, private well

Filing history

  • 2026-04-27 · MCPC #26-0116-001 · Land Dev Plan, SubDiv Plan, Prelim Plan · 9 homes

County review letters
2026-04-27 · NHANO 26-0116-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

A 134.97-acre property on Deep Creek Road in New Hanover Township is proposed to be divided into 10 single-family lots. Two existing homes would stay. Eight new homes would be built on the new lots.

The lots are large compared with a typical neighborhood. The township lists the plan as a preliminary subdivision plan, and the nearest cross street is Parestis Road. Horizon Engineering is the firm named on the county filing.

No news coverage, opposition or developer website was found. The township's planning page is the only project-specific public source found.

What it could mean nearby

Where it stands

The township lists the plan as a preliminary plan application received May 21, 2026, and it was tentatively set for the Planning Commission on August 12, 2026. Later steps usually include township review comments, plan revisions, supervisor action on the preliminary plan, and then final plan approval. The records reviewed do not show the current outcome.

Want to weigh in? The New Hanover Township Planning Commission reviews the plan first and the township supervisors decide on it. Residents can comment at their public meetings, and the township planning office can give the current schedule.

Who's behind it

Horizon Engineering · Horizon Engineering is the engineering firm named on the county filing. No official website or information on its other work was confirmed for this project.

Around the web

Planning terms explained
Preliminary plan
The first detailed subdivision plan submitted for formal township review, before final approval.
Subdivision
Dividing one property into separate lots that can be sold or built on separately.
Planning Commission
A local advisory board that reviews development plans and gives recommendations to elected officials.
Ordinance protection
A rule that generally lets a plan be judged under the local rules in effect when it was first filed.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $5.0M