PlannedNearby

Montgomery County · Whitpain · MCPC #26-0132-001

1730 Skippack Pk

1730 Skippack Pk, Whitpain, PA · 34 homes, townhomes · 13.86 acres

About this project

Terralead, LLC proposes to build 34 townhomes on 13.86 acres at 1730 Skippack Pike in Whitpain Township. The site currently has a vacant building that will be demolished to make way for the residential development.

County planning commission: Supports, with comments

Issues raised: Access roads create staggered intersections with Fieldcrest Court, Utility lines may interfere with proposed landscape plantings, Stormwater infrastructure concentrated in southeast area

Applicant
Terralead, LLC
Engineer / rep.
John Walko, Esq
Zoning
R-3B
Tax parcel
66-00-06405-00-9
Cross street
Fieldcrest Court
Approvals needed
conditional use
Demolition
vacant building

Filing history

  • 2026-05-19 · MCPC #26-0132-001 · Prelim Plan, Conditional Use · 34 homes

County review letters
2026-05-19 · WHITP 26-0132-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Terralead, LLC proposes 34 townhomes on about 13.86 acres at 1730 Skippack Pike in Whitpain Township, Montgomery County. The site has a vacant building, which would be torn down to make room for the homes.

A third-party township-news aggregator describes a Whitpain Township conditional use application (listed as CU 51-26) for a 34-unit townhome project at this address. A conditional use is a type of approval the township supervisors can grant when a project meets set conditions. The aggregator's pages contain spelling errors, and the page could not be opened for checking. A summary of its search listing also says a decision was deferred and a vote was pending. No dates, decision, opposition, or information on who would live there or whether the homes would be sold or rented was found.

What it could mean nearby

Where it stands

The project appears to be at the conditional use stage before the Whitpain Board of Supervisors, and the one source found suggests a decision was deferred or still pending. After a conditional use decision, a developer usually submits subdivision and land development plans for planning commission and supervisor review, followed by permits.

Want to weigh in? The Whitpain Township Board of Supervisors appears to decide the conditional use request, and residents can comment at its public meetings or hearings. Check the township website for the schedule.

Who's behind it

Terralead, LLC

Planning terms explained
Conditional use
A use the zoning code allows only if the township supervisors decide, after a public hearing, that the project meets set conditions.
Board of Supervisors
The elected body that governs the township and decides conditional use requests and final plan approvals.
Land development plan
Detailed site plans for roads, buildings, drainage, and utilities that the township reviews before construction.
Townhomes
Attached homes that share side walls with neighbors, usually each on its own small lot.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $12.6M