In short: 3000 Advance Lane is an industrial development in Hatfield Township, Montgomery County, PA. It would add 8,500 sq ft of non-residential space on 6.2 acres. Its estimated construction value is about $1.1M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Land dev plan, prelim plan sent to the county planning commission for review (November 5, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

In review Land dev plan, prelim plan sent to the county planning commission for review · Nov 5, 2026
  1. Proposed
  2. In reviewOct 2026
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: a planning commission recommendation, then a vote by the town's governing body.

About this project

De Nora Water Technologies plans an 8,500 square foot addition to its existing building at 3000 Advance Lane in Hatfield Township. The work would affect about 0.69 acres of the 6.24-acre site, on the east side of the building. The existing parking lot on the west side would not be changed.

Applicant
De Nora Water Technologies
Engineer / rep.
Eustace Engineering
Zoning
Light Industrial
Tax parcel
35-000-00004-00-6
Cross street
Enterprise Lane
Approvals needed
land development approval, waiver of street tree spacing requirement, waiver of monument placement requirement, waiver of sidewalk requirement, waiver of park land dedication, waiver of separate preliminary plan submission, waiver of minimum storm sewer pipe diameter
Utilities
public storm sewer

Project history

  • 2026-11-05 · MCPC #26-0283-001 · Land Dev Plan, Prelim Plan · 8,500 sq ft
  • 2026-10-27 · Hatfield Township Planning Commission · Accept receipt of plans · source

View all filings on the county site →

The full picture AI research · Nov 21, 2026

De Nora Water Technologies, which already operates at 3000 Advance Lane in Colmar, plans an 8,500-square-foot addition to its existing building. The work would be on the east side of the building. It would disturb about 0.69 acres of the 6.24-acre site. The parking lot on the west side would stay as it is.

The company's own site describes the Colmar location as a water-treatment equipment facility that has been renovated and enlarged. LoopNet lists the current building as a warehouse of roughly 44,900 square feet. No news coverage, opposition, or construction notices about this addition were found online.

What it could mean nearby

Where it stands

The preliminary land development plan was sent to the county planning commission for review on 2026-11-05, after the township planning commission accepted receipt of the plans on 2026-10-27. Review comments, township approval steps and then permits usually follow, and no sources show work has started.

Who's behind it

De Nora Water Technologies · A water-treatment technology company whose Colmar site makes Capital Controls equipment and is part of a global group with other plants, including one in Mentor, Ohio.

Around the web

Planning terms explained
Land development plan
A detailed site plan showing new buildings, paving and drainage, which the township reviews before work can proceed.
Preliminary plan
An early-stage version of the plan that reviewers can comment on before the final plan is approved.
County planning commission review
Montgomery County planners review the plan and send advice to the township, which makes the decision.

Researched by AI from public sources on Nov 21, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Hatfield Township Planning Commission and Board of Commissioners handle land development plans, and residents can comment at their public meetings, which are listed on the township website.

In Pennsylvania, Hatfield Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Hatfield Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

From the filings read by AI

Trades: sitework, stormwater

Estimated construction value: $1.1M