Proposed solar farms in Centre County, PA

Planning records show 3 solar farms and solar energy projects in Centre County, PA since 2024 (big campuses often file each phase separately, and each filing counts here). 3 are still moving through the process: 2 proposed or in review and 1 approved or permitted. The newest, Confer Solar Project in Walker Township, was filed July 8, 2026.

3projects and phases filed since 2024
3still in the process
0.0Msq ft still in the process
–est. value still in the process

Ground-mounted solar farms cover dozens or hundreds of acres, often farmland, and connect to the power grid through new equipment.

Circle size reflects project size. Updated November 24, 2026.

The biggest

Filed 2026-07-08
Industrial
Industrial
Permitted
Confer Solar Project
Walker Township, Centre County, PA
Filed 2026-06-16
Agricultural
Agricultural
In review
790-kW agri-voltaic solar facility in Boggs Township
Boggs Township, Centre County, PA
Filed 2026-04-21
Other
Other
In review
162-MW solar project, Burnside and Snow Shoe
Burnside and Snow Shoe Townships, Centre County, PA

Every solar project filed since 2024

ReceivedProjectTownTypeStageHomesSq ft
2026-07-08Confer Solar ProjectWalker TownshipIndustrialPermitted
2026-06-16790-kW agri-voltaic solar facility in Boggs TownshipBoggs TownshipAgriculturalIn review
2026-04-21162-MW solar project, Burnside and Snow ShoeBurnside and Snow Shoe TownshipsOtherIn review

How this list is made

It includes projects described as a solar farm, solar energy facility, photovoltaic array or community solar (rooftop panels on homes and businesses are left out), from public county, municipal and state planning and permit records, checked every day. Sizes are what the filings state, and construction values are rough estimates. A project refiled under the same case number counts once, but separately filed phases of one campus each count. See all trackers or upcoming public meetings.