PlannedNearby

Centre County · Walker Township · #PAD140121 · Solar farms tracker

Confer Solar Project

Walker Township, PA · industrial

In short: Confer Solar Project is an industrial development in Walker Township, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: Construction stormwater permit (earth disturbance) authorized (July 8, 2026). What usually happens next: site work and construction.

Permitted Construction stormwater permit (earth disturbance) authorized · Jul 8, 2026 · source
  1. Proposed
  2. In review
  3. Approved
  4. PermittedJul 2026
  5. Under construction
  6. Completed

Usually next: site work and construction.

About this project

A commercial solar project in Walker Township, Centre County, has a construction stormwater permit application on file with the state DEP.

Applicant
CONFER I LLC
Plan type
Construction stormwater permit (DEP)
Land use
Commercial or industrial
Status
Site active

Project history

  • 2026-07-08 · #PAD140121 · Construction stormwater permit (DEP)

DEP site record (eFACTS) →

The full picture AI research · Nov 6, 2026

The county record is a state construction stormwater permit (an earth-disturbance permit) for a site in Walker Township, filed under the company name Confer I LLC. The record lists the use only as "industrial." The permit was authorized on 2026-07-08.

A Walker Township planning agenda from November 2024 names the same company in a land development plan for the Confer Solar Project. It describes a 20-megawatt solar facility on a property off Heritage Lane. This is probably the same project, but no source ties the permit to that plan directly. Solar sites are often classed as industrial, which would fit the record.

No developer page, news story, listing or construction notice was found for this site. A 22-megawatt solar array by a different company is planned in Walker Township for local governments. No source links it to Confer I LLC. What is on the ground today is not confirmed.

What it could mean nearby

Where it stands

The state stormwater permit was authorized on 2026-07-08, so site work may legally start. No certificate of occupancy or completion appears in the records. Next steps are usually site work, building or electrical inspections, and connection to the power grid.

Who's behind it

CONFER I LLC · A company named on the filing and on the 2024 township agenda for the Confer Solar Project. No official website or other projects were found.

Around the web

Planning terms explained
Construction stormwater permit
A state permit that allows soil to be disturbed on a construction site, provided runoff and erosion are controlled.
Earth disturbance
Grading, clearing or digging that exposes soil.
Land development plan
A detailed site plan the township reviews before a project can be built.
Certificate of occupancy
An official sign-off that a finished building is safe to use.
Megawatt (MW)
A measure of how much power a solar facility can generate at its peak.

Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: Land development plans go through the Walker Township planning commission and supervisors with Centre County planning staff review, and residents can comment at their public meetings. The stormwater permit has already been issued by the state.

This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Walker Township.

Find Walker Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.