Centre County · Walker Township · #PAD140114
Pike Rd & Madison Ave Waterline
Walker Township, PA · government & utilities
In short: Pike Rd & Madison Ave Waterline is a government or utility project in Walker Township, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: Construction stormwater permit (earth disturbance) authorized (September 2, 2025). What usually happens next: site work and construction.
Usually next: site work and construction.
About this project
A Pennsylvania DEP construction stormwater permit for a water line project at Pike Road and Madison Avenue in Walker Township, Centre County, applied for by Pennsylvania American Water Company.
- Applicant
- PA AMER WATER CO
- Plan type
- Construction stormwater permit (DEP)
- Land use
- Sewer or water system
- Status
- Site active
Project history
- 2025-09-02 · #PAD140114 · Construction stormwater permit (DEP)
The full picture AI research · Nov 6, 2026
Pennsylvania American Water Company is planning a water line project at Pike Road and Madison Avenue in Walker Township, Centre County. County records show a state construction stormwater permit was authorized on September 2, 2025. That permit covers digging and soil disturbance, which pipeline work usually needs.
The records give no pipe length, cost or schedule. No developer page, news story, township notice or listing was found that clearly describes this project, so what is on the ground today is unknown.
Projects like this usually mean trenching along or across the road. They tend to cause short-term lane restrictions and sometimes temporary water-service interruptions. Once finished, the road is restored and the new pipe becomes part of the public water system.
What it could mean nearby
- Trenching in or beside Pike Road and Madison Avenue could briefly restrict traffic while work is under way.
- Residents served by the line might see short, planned water-service interruptions during connection work.
- The stormwater permit requires erosion and sediment controls to keep mud out of nearby streams and storm drains.
Where it stands
The construction stormwater permit was authorized on 2025-09-02, so the project is permitted. Pipe installation usually follows, then road restoration and permit closeout; no completion record was found.
- Sep 2, 2025 PA DEP construction stormwater permit authorized for the water line project
Who's behind it
Pennsylvania American Water Company · A regulated water and wastewater utility serving communities across Pennsylvania, which builds and replaces water mains and related systems.
Planning terms explained
- Construction stormwater permit
- A state permit for projects that disturb soil, requiring controls so muddy runoff does not reach streams or storm drains.
- Earth disturbance
- Digging, grading or clearing that exposes bare soil.
- Water main / water line
- An underground pipe that carries drinking water to homes and businesses.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The utility carries out the work under its state permit. Residents can raise road-access or construction concerns at Walker Township supervisors' meetings or with the utility directly.
This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Walker Township.
- DEP lists permit applications in the Pennsylvania Bulletin, usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Walker Township planning commission or governing body meeting when the plan is on the agenda.
Find Walker Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Mark's Custom Meats retail building3.9 mi · retail & commercial · Walker Township · filed 2026-05-19
- 234 Shady Farm Lane: 21-lot subdivision4.5 mi · 20 homes, single-family homes · Walker Township · filed 2026-10-20
- 30-lot subdivision, 27 single-family lots4.7 mi · 27 homes, single-family homes · Walker Township · filed 2026-05-19
- Storage buildings in Miles Township4.9 mi · industrial · Miles Township · filed 2024-09-15
- Confer Solar Project4.9 mi · industrial · Walker Township · filed 2026-07-08
- Mount Nittany Medical Center Bellefonte building5.8 mi · institutional · Gregg Township · filed 2026-02-18